정전비용 고려한 PV시스템의 배전계통 연계 우선순위 결정에 관한 연구

A Study on the Priority Decision for Interconnection of PV System on Power Distribution System considering Customer Interruption Costs

  • 손창남 (한국교통대 전기공학과) ;
  • 한운동 (한국교통대 전기공학과) ;
  • 문종필 (한국교통대 전기공학과)
  • 투고 : 2014.08.03
  • 심사 : 2014.08.19
  • 발행 : 2014.09.01

초록

In this paper, when photovoltaic systems are connected to distribution system, most effective capacity and location of PV system are studied considering customer interruption costs of power distribution system. The reliability model of PV system considering the duration of sunshine, the model of time-varying load and Roy Billinton test system (bus2 model) are used. To simulate the effects of PV system, various cases are selected; (1) base case which is no connection of PV system to power distribution system when faults are occurred, (2) 3MW case which is 3[MW] connection of PV system (3) 4[MW] case, and (4) 20[MW] case which is 20[MW] connection of PV system to the bus of power distribution system. The capacity limit of connected PV system is settled to 14[MW] for all cases except case 4. The reliability and customer interruption costs for residential, general, industrial, and educational customer is evaluated.

키워드

참고문헌

  1. Philip P. Barker, Robert W. De Mello, "Determining the impact of distributed generation on power systems: part1-radial distribution systems", IEEE PES Summer Meeting, Vol. 13, pp. 1645-1656, July 2000
  2. J.-F. Moon, "A Study on the Algorithm for Interconnection of PV System on Power Distribution System Considering Reliability", Trans.on KIEE Vol. 60P, No. 4, pp. 241-245, Dec. 2011 https://doi.org/10.5370/KIEEP.2011.60.4.241
  3. S.-G. Kim, J.-W. Jung, J.-S. Jung, "A Study on the Management Realities on Solar Power System", 2010 KIEE Fall Conference, pp. 510-512, Nov. 2010
  4. Richard E. Brown, Electric Power Distribution Reliability, Marcel Dekker, Inc. 2002.
  5. R. N. Allan, R. Billinton, I. Sjarief, et. al, "Reliability Test System for Educational Purposes - Basic Distribution System Data and Results", IEEE Transaction on Power Systems, Vol. 6, No. 2, May 1991.
  6. Korea Electric Power Research Institute. A study on the improvement of pole-transformer load management (technical report). Korea Electric Power Corporation, 1999; TR.96ES15.S1998.86.