Abstract
The technology to predict and prevent an accident of the cable system in power station is required. The techniques of inactivated diagnosis, partial discharge and $tan{\delta}$, have been adopted to diagnoze the operating characteristics of cables, but it is not so easy to find out problems in cables in an inactive state before the cable accident happens. In this paper, we did a research on the 6.6kV high-power cables, installed at Korean Western Power Station Co., Ltd. in order to diagonize the cables, playing a major role at the station. We have developed an equipment to measure an insulation resistance based on the temperature and current of the cable. By installing the system in a power station, we could find abnormal status for evaluation of the lifetime. In the short term, by analyzing the data, we apply the research result to the diagnosis and evaluation of the 6.6kV power cables. In the long run, however, we plan to reduce the cost of the installation and operation of cable systems at power stations.
발전소의 전력 케이블 시스템에서 발생할 수 있는 사고를 예측하고 방지하는 기술이 필요하다. 사선 상태에 있는 케이블의 동작 특성을 진단하기 위하여 부분방전 및 $tan{\delta}$ 법이 사용되고 있으나, 케이블이 갖고 있는 문제점들을 사전에 발견하기란 쉬운 일이 아니다. 이 논문에서 우리가 연구한 케이블은 (주)서부 발전소에서 설치되어 운전 중인, 발전 운영에 핵심 역할을 하는 6.6kV 고전압 배전 선로이다. 케이블의 온도 및 전류를 측정하고, 이를 바탕으로 절연저항을 측정하기 위한 장치를 개발하였다. 이 장치를 발전소 현장에 시험 설치를 하였고, 동작 중인 케이블의 수명을 평가하기 위한 동작특성의 진단을 성공적으로 마무리 하였다. 진단 데이터를 분석 평가함으로써 단기적으로는 운전 중 6.6kV 케이블 시스템의 고장상태를 파악하는데 활용되며, 장기적으로는 발전소 부하에서의 6.6kV 케이블 시스템의 설치 및 운영에 있어서 원가를 절감하기 위한 노력에 기여하고자 한다.