DOI QR코드

DOI QR Code

대기문제를 이용한 효율적인 함정정비 건선거 규모 연구

A Study on an Efficient Size Dry Docks for Warship Maintenance using Queueing Problem

  • 투고 : 2013.06.29
  • 심사 : 2014.04.23
  • 발행 : 2014.08.15

초록

Dry docks are used to repair warships or Merchant ships based on their life cycles. There are the certain number of dry docks in the ROK Navy, However, the ROK Navy force structure has been changing a lot since the Korean War. The focus of this study is to analyze the queueing problem regarding present dry docks capacities and to forecast the appropriate number of dry docks based on future naval ship structure. The study proposes to obtain an efficient dry dock size using queueing problem and simulation.

키워드

참고문헌

  1. Chae, K.-C. and Kang, M.-H. (2006), A Simple Approach to the M/M/c Queue with Synchronous Multiple Exponential Vacations, KIIE AUTUMN CONFERENCE, 312-315.
  2. Kim, Y.-M. (2009), An Optimization of Ship Building Mix under N Different Docks, IE Interfaces, 22(1), 38-43.
  3. Ko, J.-H. and Ok, C.-S. (2012), Advanced Distributed Arrival Time Control for Single Machine Problem in Dynamic Scheduling Environment, Journal of the Korean Institute of Industrial Engineers, 38(1), 31-40. https://doi.org/10.7232/JKIIE.2012.38.1.031
  4. Ko, J.-W., Kim, G.-G., and Yun, B.-K. (2013), A Study on the Optimal Appointment Scheduling for the Ship Maintenance with Queueing System with Scheduled Arrivals, Journal of the Korean Operations Research and Management Science Society, 38(3), 13-22. https://doi.org/10.7737/JKORMS.2013.38.3.013
  5. Koh, S.-G., Jang, J.-H., Choi, D.-W. and Woo, S.-B. (2011), Spatial Scheduling for Mega-block Assembly Yard in Shipbuilding Company, IE Interfaces, 24(1), 78-86. https://doi.org/10.7232/IEIF.2011.24.1.078
  6. Korea Minister of National Defense (KMND)(2013), 2012 Defense White Paper, KMND, Korea.
  7. Lee, H.-W. (2006), Queueing Theory (3rd edition), Sigma Press, Seoul, Korea.
  8. Lee, H.-Y. and Hur, S. (1999), A Two-step Approximation for the System Size of M/G/c Queueing Systems, KORMS.KIIE AUTUMN CONFERENCE, 585-590.
  9. Lee, S.-H. and Lee, I.-G. (2008), Heuristic Algorithm for the Singlemachine Scheduling with Periodic Maintenance, Journal of the Korean Institute of Industrial Engineers, 34(1), 318-327.

피인용 문헌

  1. A Study on the Optimal Allocation of Maintenance Personnel in the Naval Ship Maintenance System vol.16, pp.3, 2015, https://doi.org/10.5762/KAIS.2015.16.3.1853