References
- J.U.D. Hatmoko, S. Scott, "Simulating the impact of supply chain management practice on the performance of medium‐sized building projects", Construction Management and Economics, vol. 28, no. 1, pp. 35-49, 2010. https://doi.org/10.1080/01446190903365632
- E.W.L. Chan, "Action Research: the Use of Enterprise Resource Planning System in Construction Engineering and Project Management", Journal of Construction Engineering and Project management, vol. 1, no. 3, pp. 19-27, 2011.
- T.H. Shin, S.W. Yoon, S. Chin, "A Construction Supply Chain Management Process with RFID/WSN-based Logistics Equipment", Journal of Construction Engineering and Project management, vol. 2, no. 4, pp. 11-19, 2012. https://doi.org/10.6106/JCEPM.2012.2.4.011
- N. Kasim, "ICT Implementation for Materials Management in Construction Projects: Case Studies", Journal of Construction Engineering and Project management, vol. 1, no. 1, pp. 31-36, 2011. https://doi.org/10.6106/JCEPM.2011.1.1.031
- M. Anson, S.L. Tang, K.C. Ying, "Measurement of the performance of ready mixed concreting resources as data for system simulation", Construction Management and Economics, vol. 20, no. 3, pp. 237-50, 2002. https://doi.org/10.1080/01446190210121297
- M. A. Ammar, Y.A. Mohieldin, "Resource constrained project scheduling using simulation", Construction Management and Economics, vol. 20, no.4, pp. 323-30, 2002. https://doi.org/10.1080/01446190210131098
- M. Park, W. Kim, H. Lee, S. Han, "Supply chain management model for ready mixed concrete", Automation in Construction, vol. 20, no. 1, pp. 44-55, 2011. https://doi.org/10.1016/j.autcon.2010.07.005
- L.E. Bernold, "Simulation of non-steady construction processes", Journal of Construction Engineering and Management, vol. 115, no. 2, pp. 163-78, 1986.
- S. D. Smith, "Earthmoving productivity estimation using linear regression techniques", Journal of Construction Engineering and Management, vol. 125, no. 3, pp. 133-41, 1999. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(133)
- L.E. Bernold, S. AbouRizk, "Managing Performance in Construction", Wiley, Hoboken, New Jersey, ISBN 978-0-470-17164-6, 2010.
- S.L. Tang, K.C. Ying, M. Anson, M. Lu, "RMCSIM: A simulation model of a ready‐mixed concrete plant serving multiple sites using multiple truckmixers", Construction Management and Economics, vol. 23, no. 1, pp. 15-31, 2005. https://doi.org/10.1080/0144619032000124661
- J. Jackson, "Nighttime road construction: current issues", Centre for Transportation Research and Education Iowa State University, 2005.
- D. Arditi, D. Lee, G. Polat, "Fatal accidents in nighttime vs. Daytime highway construction work zones', Journal of Safety Research, vol. 38, no. 4, pp. 399-405, 2007. https://doi.org/10.1016/j.jsr.2007.04.001
- J.W. Hinze, D. Carlisle, "An evaluation of the important variables in nighttime construction", Seattle, WA: Transportation Northwest, Department of Civil Engineering, University of Washington, 1990.
- L. Bernold, "Construction Equipment and Methods", John Wiley & Sons, Inc., ISBN 978-0-470-16986-5, 2013.
- M.R. Manavazhi "Hybrid modelling framework for synthesizing virtual structures", Construction Management and Economics, vol. 18, no. 4, pp. 415-26, 2000. https://doi.org/10.1080/01446190050024833
- J. Martinez, P.G. Ioannou, "General purpose simulation with stroboscope", Proceedings of the Winter Simulation Conference, IEEE, Piscataway, pp. 1159-66, 1994.
- Anylogic Version 6 - Manual. XJ Technologies, http://www.xjtek.com/ , 2008.
- C.T. Hyun, T.H. Hong, S.M. Ji, J.H. Yu, S.B. An, "The Development of Probabilistic Time and Cost Data: Focus on field conditions and labor productivity" Journal of Construction Engineering and Project management, vol. 1, no. 1, pp. 37-43, 2011.
- K.J. Yi, "Modelling of On-Site Energy Consumption Profile in Construction Sites and a Case Study of Earth Moving", Journal of Construction Engineering and Project management, vol. 3, no. 3, pp. 10-16, 2013.
- A.M. Hajji, M.P. Lewis, "Development of Productivity-based Estimating Tool for Fuel Use and Emissions from Earthwork Construction Activities", Journal of Construction Engineering and Project management, vol. 3, no. 2, pp. 58-65, 2013. https://doi.org/10.6106/JCEPM.2013.3.2.058
- Masternaut Connect, http://www.masternaut.com.
- T.L. Saaty , "The Analytical Hierarchy Process: Planning, Priority Setting, and Resources Allocation", McGraw-Hill, New York, 1980.