Abstract
The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.
지속가능한 발전을 추구하는 최근의 추세에서 해체산업은 자원의 재활용이나 재생측면에서 중요성이 더욱 커져가고 있다. 주택건립 및 기존주택현황을 고려할 때 해체시장의 규모는 계속 증가될 것으로 예측되고 있다. 그러나 국내에는 해체공사의 발주 및 입찰에 기본이 되는 내역기준이 매우 미비한 실정이고, 공사비를 산정하기 위한 전산시스템도 개발되어 있지 못하다. 따라서 본 연구에서는 분별해체에 대한 시험시공 자료를 분석하여 분별해체공사의 일위대가 산정에 도움 될 수 있는 품 21개 항목과 현재 해체공사에 가장 많이 활용되고 있는 1.0m3 급 압쇄장비의 작업능력을 제시한다. 해체공사의 원활한 공사비 견적을 위해 해체공사에 특화하여 단가정보, 단가관리, 표준일위대가관리, 일위대가표, 내역서 작성, 보고서 작성 시스템을 개발하였다. 공사비 견적 시스템은 기계식해체와 발파식해체에 공통 적용가능토록 구성하였다. 본 시스템의 가장 큰 특징은 표준 WBS를 활용하여 비용견적을 수행하는 것이다. WBS는 표준 일위대가표 및 표준 DB와 연계되어 견적에 경험이 없는 사용자도 견적작업을 수행할 수 있는 장점을 갖게 된다.