References
- Chang, H. J., Su, R. H., Yang, C. T., and Weng, M. W. (2012), An Economic Manufacturing Quantity Model for a Two-Stage Assembly System with Imperfect Processes and Variable Production Rate, Computers and Industrial Engineering, 63, 285-293. https://doi.org/10.1016/j.cie.2012.02.011
- Chiu, S. W., Chiu, Y. P., and Yang, J. C. (2012), Combining an Alternative Multi-Delivery Policy into Economic Production Lot Size Problem with Partial Rework, Expert Systems with Applications, 39, 2578-2583. https://doi.org/10.1016/j.eswa.2011.08.112
- Chiu, S. W., Lin, H. D., Wu, M. F., and Yang, J. C. (2011), Determining Replenishment Lot Size and Shipment Policy for an Extended EPQ Model with Delivery and Quality Assurance Issues, Scientia Iranica E, 18(6), 1537-1544. https://doi.org/10.1016/j.scient.2011.09.008
- Chiu, Y. P., Chen, K. K., and Ting, C. K., (2012), Replenishment Run Time Problem with Machine Breakdown and Failure in Rework, Expert Systems with Applications, 39, 1291-1298. https://doi.org/10.1016/j.eswa.2011.08.005
- Chung, K.-J. and Huang, Y.-F. (2003), The Optimal Cycle Time for EPQ Inventory Model under Permissible Delay in Payments, International Journal of Production Economics, 84(3), 307-318. https://doi.org/10.1016/S0925-5273(02)00465-6
- Goyal, S. K. (1985), Economic Order Quantity under Conditions of Permissible Delay in Payments, The Journal of the Operational Research Society, 36(4), 335-338. https://doi.org/10.1057/jors.1985.56
- Hu, F. and Liu, D. (2010), Optimal Replenishment Policy for the EPQ Model with Permissible Delay in Payments and Allowable Shortages, Applied Mathematical Modelling, 34, 3108-3117. https://doi.org/10.1016/j.apm.2010.01.016
- Jeang, A. (2012), Simultaneous Determination of Production Lot Size and Process Parameters under Process Deterioration and Process Breakdown, Omega, 40, 774-781. https://doi.org/10.1016/j.omega.2011.12.005
- Kao, P. C. (1997), An introduction to Stochastic Processes, Duxbury Press, Belmont, California.
- Kreng, V. B. and Tan, S. J. (2011), Optimal Replenishment Decision in an EPQ Model with Defective Items under Supply Chain Trade Credit Policy, Expert Systems with Applications, 38, 9888-9899. https://doi.org/10.1016/j.eswa.2011.02.040
- Mahata, G. C. (2012), An EPQ-Based Inventory Model for Exponentially Deteriorating Items under Retailer Partial Trade Credit Policy in Supply Chain, Expert Systems with Applications, 39, 3537-3550. https://doi.org/10.1016/j.eswa.2011.09.044
- Pasandideh, S. H. R. and Niaki, S. T. A. (2008), A Genetic Algorithm Approach to Optimize a Muliti-Products EPQ Model with Discrete Delivery Orders and Constrained Space, Applied Mathematics Computation, 195, 506-514. https://doi.org/10.1016/j.amc.2007.05.007
- Sarkar, B. (2012), An Inventory Model with Reliability in an Imperfect Production Process, Applied Mathematics and Computation, 218, 4881-4891. https://doi.org/10.1016/j.amc.2011.10.053
- Sarkar, B. and Moon, I. (2011), An EPQ Model with Inflation in an Imperfect Production System, Applied Mathematics and Computation, 217, 6159-6167. https://doi.org/10.1016/j.amc.2010.12.098
- Taft, E. W. (1918), The Most Economical Production Lot, The Iron Age, 101, 1410-1412.
- Taleizadeh, A. A., Niaki, S. T. A., and Najafi, A. A. (2010), Multiproduct Single-Machine Production System with Stochastic Scrapped Production Rate, Partial Backordering and Service Level Constraint, Journal of Computational and Applied Mathematics, 233(8), 1834-1849. https://doi.org/10.1016/j.cam.2009.09.021
- Yassine, A., Maddah, B., and Salameh, M. (2012), Disaggregation and Consolidation of Imperfect Quality Shipments in Extended EPQ Model, International Journal of Production Economics, 135, 345-352. https://doi.org/10.1016/j.ijpe.2011.08.010