References
- Agarwal, A., Colak, S., Jacob, V. S., and Pirkul, H. (2006), Heuristics and augmented neural networks for task scheduling with non-identical machines, European Journal of Operational Research, 175(1), 296-317. https://doi.org/10.1016/j.ejor.2005.03.045
- Allahverdi, A., Gupta, J. N. D. and Aldowaisan, T. (1999), A review of scheduling research involving setup considerations, OMEGA The International Journal of Management Science, 27(2), 219-239. https://doi.org/10.1016/S0305-0483(98)00042-5
- Allahverdi, A., Ng, C. T., Cheng, T. C. E., and Kovalyov, M. Y. (2008), A survey of scheduling problems with setup times or costs, European Journal of Operational Research, 187(3), 985-1032. https://doi.org/10.1016/j.ejor.2006.06.060
- Cheng, T. C. E. and Sin, C. C. S. (1990), A state-of-the-art review of parallel-machine scheduling research, European Journal of Operational Research, 47(3), 271-292. https://doi.org/10.1016/0377-2217(90)90215-W
- Gharehgozli, A. H., Tavakkoli-Moghaddam, R., and Zaerpour, N. (2009), A fuzzy-mixed integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates, Robotics and Computer-Integrated Manufacturing, 25 (4/5), 853-859. https://doi.org/10.1016/j.rcim.2008.12.005
- Guinet, A. (1990), Textile production systems : a succession of non-identical parallel processor shops, Journal of the Operational Research Society, 42(8), 655-671.
- Hop, N. V. and Nagaur, N. N. (2004), The scheduling problem of PCBs for multiple non-identical parallel machines, European Journal of Operational Research, 158(3), 577-594. https://doi.org/10.1016/S0377-2217(03)00376-X
- Joo, C. M. and Kim, B. S. (2012a), Non-identical parallel machine scheduling with sequence and machine dependent setup times using metaheuristic algorithms, Industrial Engineering and Management Systems, 11(1), 114-122. https://doi.org/10.7232/iems.2012.11.1.114
- Joo, C. M. and Kim, B. S. (2012b), Genetic algorithm with an effective dispatching method for unrelated parallel machine scheduling with sequence dependent and machine dependent setup times, IE Interfaces, 25(3), 357-364. https://doi.org/10.7232/IEIF.2012.25.3.357
- Kang, Y. H., Lee, H. C. and Kim, S. S. (1998), Scheduling for non-identical parallel machines with different due dates, Journal of the Korean Institute of Industrial Engineers, 24(1), 37-50.
- Lee, J. S. and Park, S. H. (1999), Scheduling for two stage mixed flow production system with non-identical parallel machines, Journal of the Korean Institute of Industrial Engineers, 25(2), 254-265.
- Li, K. and Yang, S. L. (2009), Non-identical parallel-machine scheduling research with minimizing total weighted completion times : Models, relaxations and algorithms, Applied Mathematical Modelling, 33(4), 2145-2158. https://doi.org/10.1016/j.apm.2008.05.019
- Marsh, J. D. and Montgomery, D. C. (1973), Optimal procedure for scheduling jobs with sequence-dependent changeover times on parallel processors, AIIE Technical Papers, 279-286.
- Potts, C. N. and Kovalyov, M. Y. (2000), Scheduling with batching : A review, European Journal of Operational Research, 120(2), 228-249. https://doi.org/10.1016/S0377-2217(99)00153-8
- Ruiz, R. and Vazquez-Rodriguez, J. A. (2010), The hybrid flow shop scheduling problem, European Journal of Operational Research, 205(1), 1-18. https://doi.org/10.1016/j.ejor.2009.09.024
- Tavakkoli-Moghaddam, R., Taheri, F., Bazzazi, F., Izadi, M., and Sassani, F. (2009), Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints, Computers and Operations Research, 36(12), 3224-3230. https://doi.org/10.1016/j.cor.2009.02.012
- Vallada, E. and Ruiz, R. (2011), A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times, European Journal of Operational Research, 211(3), 612-622. https://doi.org/10.1016/j.ejor.2011.01.011
- Weng, M. X., Lu, J. and Ren, H. (2001), Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective, International Journal of Production Economics, 70(3), 215-226. https://doi.org/10.1016/S0925-5273(00)00066-9
- Zhu, Z. and Heady, R. B. (2000), Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach, Computers and Industrial Engineering, 38(2), 297-305. https://doi.org/10.1016/S0360-8352(00)00048-6