DOI QR코드

DOI QR Code

Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage -

LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 -

  • Park, Hwan Pyo (Construction Management & Economy Research Division, Korea Institute of Construction Technology) ;
  • Han, Jae Goo (Construction Management & Economy Research Division, Korea Institute of Construction Technology) ;
  • Chin, Kyung Ho (Construction Management & Economy Research Division, Korea Institute of Construction Technology)
  • 박환표 (한국건설기술연구원 건설관리경제연구실) ;
  • 한재구 (한국건설기술연구원 건설관리경제연구실) ;
  • 진경호 (한국건설기술연구원 건설관리경제연구실)
  • Received : 2013.12.26
  • Accepted : 2014.03.20
  • Published : 2014.05.31

Abstract

LNG plant projects tend to be implemented in overseas owing to its characteristics, so their project management scheme is somewhat different from those of general projects. Value chain in a LNG plant project includes exploration/production of gases, physical liquefaction/chemical conversion processes, transportation and storage. Key factors in the chain include liquefaction process (including ultra-low temperature liquefaction) to convert natural gas into liquid materials or fuel, and Front End Engineering Design (FEED) package, as well as Engineering, Procurement and Construction (EPC) technology comprising control, operation and construction. Success of a complex LNG plant project implemented in overseas depends on decision-making process in project management. Accordingly, to develop a decision-making model in of plant construction, the study extracted none factors in project management by EPC stage and assessed importance of each factor. The result showed that items in both project management and project risk management are important. Especially, the study developed a decision-making model in the construction stage of a LNG plant project based on the project management factors and importance assessment. The developed decision-making model would lay groundwork in building a decision-making system in construction stage of project management.

LNG 플랜트사업은 그 특성상 해외에서 사업을 추진하기 때문에 사업관리도 일반적인 사업관리방식과는 차이점이 있다. LNG 플랜트 사업 프로세스는 가스탐사 및 생산, 물리적인 액화 및 화학적인 전환공정, 수송, 저장 등의 가치사슬로 구성되며, 주로 천연가스를 액체원료나 연료로 전환하는 장치를 중심으로 액화공정(초저온 액화) 및 FEED 패키지, 제어 운영, 건설수행 등 EPC 기술을 대상으로 하고 있다. 이러한 해외에서 수행되고 복잡한 LNG 플랜트공사의 성공은 사업관리 의사결정에 따른 사업의 성패가 달라질 수 있다. 따라서 본 연구는 LNG 플랜트공사의 시공단계 사업관리 의사결정지원 모델을 구축하기 위하여 EPC 단계별로 9개의 사업관리요소 항목을 도출하고, 각 항목별 중요도를 평가하였다. 중요도 평가결과, EPC 단계별로 사업관리와 리스크관리 항목이 공통적으로 중요한 것으로 도출되었다. 특히 본 연구는 사업관리 요소항목과 중요도 평가결과를 기반으로 LNG 플랜트공사의 시공단계의 의사결정지원모델을 개발하였다. 개발된 의사결정지원모델은 향후 시공단계의 사업관리 의사결정지원 시스템 구축의 기반이 될 것이다.

Keywords

References

  1. Lee, Y. N. (2007). "Management Research in Plant Construction", Ministry of Construction and Transportation.
  2. Lee, H. I. (2013). "2014 Construction Business View", Construction Economy Research Institute of Korea, p.11
  3. Han, J. K., Jin, K. H., and Park, H. P. (2010). "Elicitation Project Management Factors and Evaluation of its Weight to Ensure LNG Plant Success", Journal of the Korea Institute of Building Construction, Proceedings of JKIBC Annual Conference, JKIBC, 10(1), pp. 85-86.
  4. Chun, J. Y., and Oh, S. J. (2003). "Constitutional Directions of Decision Support System for Cooperative Design in Architectural Design Phase", Korean journal of Construction Engineering and Management, KICEM, 4(2), pp. 91-92.
  5. Lee, J. K. (2004). "Proposal of an Application Characteristic Model of Information System for Construction Decision-making Support", Proceedings of KICEM Annual Conference, KICEM, pp. 153-154.
  6. Lee, J. K., and Lee, H. S. (2004). "Extraction of Pivotal Entities of Construction Project Management using the CMBOK Framework", Korean journal of Construction Engineering and Management, KICEM, 5(1), pp. 140-141.
  7. Jang, W. S., Hong, H. W., and Han, S. H. (2011). "Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase-", Korean journal of Construction Engineering and Management, KICEM, 12(5), pp. 146-147. https://doi.org/10.6106/KJCEM.2011.12.5.146
  8. Park, B. J., Lee, M. J., and Lee, T. S. (2005), "Development of EPC Business Process Management Model for Improving Plant Project Management", Korean journal of Construction Engineering and Management, KICEM, 9(5), pp. 149-150.
  9. Robert, G. C. (2005). Product leadership : pathways to profitable innovation.
  10. Han, W. H. (2003). "Global prospect of International LNG Market".
  11. PMI (2003)." A Guide to the Project Management Body of Knowledge (Pmbok Guide)", - 5th Edition.

Cited by

  1. Technology Valuation Evaluation Model of Decision Making System using Income Approach for Commercialization in LNG Plant Construction vol.15, pp.4, 2014, https://doi.org/10.6106/KJCEM.2014.15.4.058
  2. Model development for site selection considering the characteristics of LNG receiving terminal vol.16, pp.1, 2015, https://doi.org/10.6106/KJCEM.2015.16.1.082