DOI QR코드

DOI QR Code

Study on the Integrated SCM Performance Formation Model through Supplier Development Project and Asset Specificity

공급자개발계획과 자산전용성을 통한 통합적 SCM성과형성모델에 관한 연구

  • Song, Jang-Gwen (School of Management, Chungnam National University) ;
  • Oh, Se-Gu (School of Management, Chungnam National University)
  • Received : 2014.08.29
  • Accepted : 2014.10.13
  • Published : 2014.10.30

Abstract

Purpose - This study aims to clarify through which process asset specificity and supplier development project (SDP) affect performance. Cooperation, partnership, the level of information exchange, and the importance of information sharing are considered significant variables as mediators related to the process. Finally, the performance formation model of the supply chain through asset specificity and supplier development project would be suggested as being a result of this study. Research design, data, and methodology - Data collection was as follows: questionnaires were distributed to 250 companies that have business ties with H Company. The empirical study to test our hypothesis was based on statistical analysis (using SPSS 19.0 and AMOS 19.0). The hypothesis of this paper is that the asset specificity and supplier development project variables have positive effects on the following variables: mediators such as cooperation and partnership (reliability and dependence); and the cooperation and partnership variables have a positive effect on the following variables: level of information sharing, the importance of information sharing, and level of information sharing; the importance of information sharing has a positive effect on supply chain performance. We tested our hypothesized model utilizing path analysis with latent variables. Results - First, it was found that asset specificity has significant positive effects on cooperation (H1), reliability (H2), and dependability (H3). Second, it was proved that the level of comprehension on the purpose of SDP has positive effects significantly on cooperation (H4), reliability (H5), and dependability (H6). Third, the hypotheses related to cooperation were all significantly accepted. The relationships of cooperation with the level (H7) and importance (H8) of information sharing were significant. Fourth, the hypotheses related to reliability were all significantly accepted. The relationships of reliability with the level (H9) and importance (H10) of information sharing were significant. In terms of dependability, however, the hypotheses were partially accepted. The effect of dependability was significant on the importance of information sharing (H12), but insignificant on the level of information sharing (H11). Finally, the causal relationships from the level of information sharing to SCM performance (H13) and from the importance of information sharing to SCM performance (H14) were both significantly accepted. Conclusion - First, with rapid changes in the business environment, enterprises should acquire the right information to properly implement SCM. For successful SCM, firms should understand the supplier development project. Second, asset specificity and the level of comprehension on SDP have significant effects both on cooperation and partnership (reliability and dependability). Third, mediators such as cooperation, reliability, and dependability significantly affect the level and importance of information sharing. Fourth, the level and importance of information sharing have significant impacts on SCM performance. This paper makes a meaningful contribution to further the understanding of how SDP affects SCM performance. Finally, successful SCM performance is achieved by information sharing through a collaborative environment and partnership (confidence & dependence) rather than by investing only in setting up an information system.

Keywords

Cited by

  1. 공급자개발 성숙도모형이 ERP 확산과 SCM 성과에 미치는 영향에 관한 연구 vol.14, pp.5, 2014, https://doi.org/10.15722/jds.14.5.201605.71