References
- Akahori, T., Matsuno, Y., Adachi, Y., Yamamoto, N., Hamatsuka, Y., and Nishi, T. (2008), Application of REM (Recyclability Evaluation Method) to home electric appliances, Journal of the Japan Society of Waste Management Experts, 19(1), 44-50. https://doi.org/10.3985/jswme.19.44
- Arakawa, M. and Yamada, T. (2009), Operation design for disassembly considering a product structure, Symposium on Group Technology and Cellular Manufacturing 2009 (GT/CM2009), Kita-kyushu, Japan, 190-197.
- Avikal, S., Mishra, P. K., Jain, R., and Yadav, H. C. (2013), A PROMETHEE method based heuristic for disassembly line balancing problem, Industrial Engineering and Management Systems, 12(3), 254-263. https://doi.org/10.7232/iems.2013.12.3.254
- Aydemir-Karadag, A. and Turkbey, O. (2013), Multiobjective optimization of stochastic disassembly line balancing with station paralleling, Computers and Industrial Engineering, 65(3), 413-425. https://doi.org/10.1016/j.cie.2013.03.014
- Baybars, I. (1986), A survey of exact algorithms for the simple assembly line balancing problem, Management Science, 32(8), 909-932. https://doi.org/10.1287/mnsc.32.8.909
- Hiroshige, Y., Nishi, T., and Ohashi, T. (2002), Recyclability evaluation method, Proceedings of the ASME 2002 International Mechanical Engineering Congress and Exposition, New Orleans, LA, 835-839.
- Igarashi, K., Yamada, T., and Inoue, M. (2013), Disassembly system design with environmental and economic parts selection using the recyclability evaluation method, Journal of Japan Industrial Management Association, 64(2E), 293-302.
- Ilgin, M. A. and Gupta, S. M. (2010), Environmentally conscious manufacturing and product recovery (EC MPRO): a review of the state of the art, Journal of Environmental Management, 91(3), 563-591. https://doi.org/10.1016/j.jenvman.2009.09.037
- Inoue, M., Akiyama, T., and Ishikawa, H. (2011), Lifecycle design support system based on 3D-CAD using set-base design method, Proceedings of the Japan Society of Mechanical Engineers 21th Conference on Design Engineering and System Department, Osaka, Japan, 420-423.
- Kalayci, C. B. and Gupta, S. M. (2013), Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem, Expert Systems with Applications, 40(18), 7231-7241. https://doi.org/10.1016/j.eswa.2013.06.067
- Kubo, M. (2000), Combinatorial Optimization and Algorithm, Kyoritsu Shuppan, Tokyo, Japan.
- Kuo, T. C. (2013), Waste electronics and electrical equipment disassembly and recycling using Petri net analysis: considering the economic value and environmental impacts, Computers and Industrial Engineering, 65(1), 54-64. https://doi.org/10.1016/j.cie.2011.12.029
- Lambert, A. J. D. and Gupta, S. M. (2005), Disassembly Modeling for Assembly, Maintenance, Reuse, and Recycling, CRC Press, Boca Raton, FL.
- McGovern, S. M. and Gupta, S. M. (2003), 2-Opt heuristic for the disassembly line balancing problem, Proceedings of the SPIE, 5262, 71-84.
- Nof, S. Y., Wilhelm, W. E., and Warnecke, H. (1997), Industrial Assembly, Chapman and Hall, New York, NY.
- Pochampally, K. K., Nukala, S., and Gupta, S. M. (2008), Strategic Planning Models for Reverse and Closed- Loop Supply Chains, CRC Press, Bora Raton, FL.
- Tanaka, K., Kobayashi, H., and Yura, K. (2013), A multiobjective model for locating drop-off boxes for collecting used products, Industrial Engineering and Management Systems, 12(4), 351-358. https://doi.org/10.7232/iems.2013.12.4.351
- Wang, H. F. and Gupta, S. M. (2011), Green Supply Chain Management: Product Life Cycle Approach, McGraw-Hill, New York, NY.
- Yamada, T. and Matsui, M. (2001), 2-Stage design method for assembly line systems with stoppers, Journal of Japan Industrial Management Association, 51(6), 594-602.
- Yamada, T. and Sunanaga, K. (2011), Information sharing and utilization for environmental loads in disassembly system design with PLM, Proceedings of the 9th Global Conference on Sustainable Manufacturing, St. Petersburg, Russia, 263-268.
- Yamada, T., Kameda, J., and Igarashi, K. (2011), Model and design of recycling disassembly systems with material recovery values, Proceedings of the 21th International Conference on Remanufacturing (ICoR), Glasgow, UK, 211-217.
Cited by
- Disassembly parts selection and analysis for recycling rate and cost by goal programming vol.10, pp.3, 2016, https://doi.org/10.1299/jamdsm.2016jamdsm0052
- Disassembly line balancing problem: a review of the state of the art and future directions pp.1366-588X, 2018, https://doi.org/10.1080/00207543.2018.1428775
- Analysis of Environmental and Economic Disassembly Parts Selection by Goal Programming vol.40, pp.None, 2016, https://doi.org/10.1016/j.procir.2016.01.092
- Disassembly Reuse Part Selection for Recovery Rate and Cost with Lifetime Analysis vol.12, pp.6, 2014, https://doi.org/10.20965/ijat.2018.p0822
- Remanufacturing Option Selection with Disassembly for Recovery Rate and Profit vol.14, pp.6, 2020, https://doi.org/10.20965/ijat.2020.p0930