참고문헌
- General Services Asministrations, Part 31 of Federal Aquisition Regulations(FAR) of the USA.
- Kim, Gyuntae, Han, Jaegu and Shin, Eunyoung (2007). 'Analysis on the Domestic Actual Budgeting for Construction Engineering Project.' Korea Institute of Construction Engineering and Management Conference Paper Collection, pp. 999-1000.
- Kim, C., Jung, Y., Kim, Y., Hyun, C. (2002). 'A Study on the Estimating Strategy for the Design Phase VE Consulting Fee', Korean Journal of Construction Engineering and Management, KICEM, 3(1), pp. 97-106.
- Lee, U., Yoo, W., Kim, T., Cha, M., Cho, H. (2012). 'Improvement of Estimating Method for Construction Management Service Fee by Case Study', Korean Journal of Construction Engineering and Management, KICEM, 13(4), pp. 17-20.
- Korea Software Industry Association, (2013). Guideline for SW Project Price Calculation, pp. 1-27.
- Ministry of Strategy and Finance, (2013). Article 2 Sub-Paragraph 2 of the Enforcement Decree of the Act on Contracts to Which the State is a Party.
- Ministry of Strategy and Finance, (2012). Article 15 through 22 of Criteria for Preparation of Projected Price.
- Ministry of Finance, (1994). Enforcement Decree of Budget and Accounting Act.
- Ministry of Finance, (1969). Regulations on the Handling of Contracting Tasks.
- Ministry of Finance, (1969). Article 76 through 78 of the Enforcement Decree of Budget and Accounting Act.
- Ministry of Industry, Trade and Energy, (2012). Article 7 through 10 of criteria for Project Price for Engineering Project.
- Ministry of Industry, Trade and Energy, (2007). Criteria for Project Price for Software Projects.
- Ministry of Land, Infrastructure and Transport, (2013a). Article 4 of Price Criteria for Construction Project Management.
- Ministry of Land, Infrastructure and Transport, (2013b). Article 4 and 7 of Price Criteria for Construction Supervision.
- Ministry of Land, Infrastructure and Transport, (2012). Article 8 of Work Scope and Price Criteria for Architect for Public Works.
- Office of Management and Budget(OMB) of the USA, Cost Principles of Circular A-122.
- Public Procurement Service, (2013a). Criteria for Application of Expenses Ratio in Cost Calculation for Construction, Industrial, Environmental and Facilities Works.
- Public Procurement Service, (2012). Public Procurement Statistics as of December 31, 2012. pp. 43-56.
- Public Procurement Service, (2013b). Criteria for Execution of Construction Works, pp. 81-122.
- The Institute of Professional Engineers of Japan, (2011). Guideline for Remuneration for Engineers.
피인용 문헌
- A study on the method for the Integrated Cost Estimate based on Project(ICEP) of program management with typical model vol.16, pp.1, 2015, https://doi.org/10.6106/KJCEM.2015.16.1.119
- An Analysis of the 2014 Pricing Guide for Technical Service Contracts through Comparison with Foreign Countries' Cases vol.16, pp.3, 2015, https://doi.org/10.6106/KJCEM.2015.16.3.152
- A Study on the Method for the Estimate of Construction Management in the Program Management vol.15, pp.5, 2014, https://doi.org/10.6106/KJCEM.2014.15.5.003