References
- Haugan, Gregory T., 2008. Work Breakdown Structures for Projects, Programs, and Enterprises. Management Concepts: Virginia.
- ISAF, 2013. The Equipment Rules of Sailing for 2013-2016, ISAF Ltd.: Southampton.
- Jeong, Y.K. Nam, S.H. Lee, D.K. & Shin, J.G., 2012, Design of the product-oriented work breakdown structure for the construction of the sailing yacht integrated management system. 2012 Conference on Korean Institute of Industrial Engineers, Gyeongju, Republic of Korea, 10-11 May 2012.
- Koenig, P.C. MacDonald, P. Lamb, T. & Dougherty, J., 1997. Towards a generic product-oriented work breakdown structure for shipbuilding. 1997 NSRP Symposium, New Orleans, USA, 21-23 April 1997.
- Korea Shipbuilding Industry Cooperative, 2009, Guideline for Sea Trial of Sailing Yachts, Seoul: Korea Shipbuilding Industry Cooperative KOSIC 001:2009.
- Lee, D.K. Nam, S.H. Jeong, Y.K. & Shin, J.G., 2013. Development of a Web-Based Application for Ywbs in Integrated Management Systems. Journal of the Korean Institute of Industrial Engineers, 39(1), pp.46-54. https://doi.org/10.7232/JKIIE.2013.39.1.046
- Lee, P., 2012. Design of a web-based system for E-Commerce of sail-yachts. 2012 Conference on Korean Institute of Industrial Engineers, Ansan, Republic of Korea, 2 November 2012.
- Lee, P. Lee, D.K. Back, M.G. Oh, D.K. & Choi, Y.R., 2012. Design of a Web-based System for Collaborative Power-boat Manufacturing. Transactions of the Korean Society of Mechanical Engineers A, 36(3), pp.265-273. https://doi.org/10.3795/KSME-A.2012.36.3.265
- Luong, L.H.S., 1989. Process Planning via Computer-assisted Classification and Coding. The International Journal of Advanced Manufacturing Technology, 4(3), pp.311-320. https://doi.org/10.1007/BF02601529
- Malcolm, D.G. Roseboom, J.H. Clark, C.E. & Fazar, W., 1959. Application of a Technique for Research and Development Program Evaluation. Operations research, 7(5), pp.646-669. https://doi.org/10.1287/opre.7.5.646
- Okayama, Y. & Chirillo, L.D., 1980, Product Work Breakdown Structure, National Shipbuilding Research Program Vol. 117, Washington, D.C. : U.S. Dept. of Commerce, Maritime Administration in cooperation with Todd Pacific Shipyards Corporation
-
Project Management Institute (PMI), 2004. A Guide to the Project Management Body of Knowledge (PMBOK
$^{(R)}$ Guide). Newtown Square: Project Management Institute. - Royal Ocean Racing Club (RORC), 2013. IRC Measurement. Seahorse Rating Ltd.: Hampshire.
- US DoD & NASA. 1962. DoD and NASA Guide: PERT Cost Systems Design. DoD and NASA: Washington.
- US DoD. 1968. Work Breakdown Structures for Defense Materiel Items. DoD: Washington.
- US DoD. 1998. DoD Handbook: Work Breakdown Structures. DoD: Washington.
Cited by
- Environmental impact assessment of composite small craft manufacturing using the generic work breakdown structure vol.3, pp.3, 2016, https://doi.org/10.1007/s40684-016-0034-2