Optimal Machine Operation Planning under Time-based Electricity Rates

시간대별 차등 전기요금을 고려한 최소비용 장비운용계획

  • Kim, Inho (Industrial Engineering, Hongik University) ;
  • Ok, Changsoo (Industrial Engineering, Hongik University)
  • 김인호 (홍익대학교 산업공학과) ;
  • 옥창수 (홍익대학교 산업공학과)
  • Received : 2014.08.29
  • Accepted : 2014.10.08
  • Published : 2014.12.31

Abstract

As power consumption increases, more power utilities are required to satisfy the demand and consequently results in tremendous cost to build the utilities. Another issue in construction of power utilities to meet the peak demand is an inefficiency caused by surplus power during non-peak time. Therefore, most power company considers power demand management with time-based electricity rate policy which applies different rate over time. This paper considers an optimal machine operation problem under the time-based electricity rates. In TOC (Theory of Constraints), the production capacities of all machines are limited to one of the bottleneck machine to minimize the WIP (work in process). In the situation, other machines except the bottleneck are able to stop their operations without any throughput loss of the whole manufacturing line for saving power utility cost. To consider this problem three integer programming models are introduced. The three models include (1) line shutdown, (2) block shutdown, and (3) individual machine shutdown. We demonstrate the effectiveness of the proposed IP models through diverse experiments, by comparing with a TOC-based machine operation planning considered as a current model.

Keywords

References

  1. Do, Y.B., Need for electric power demand management and management skills, Policy data of Korea.
  2. Goldratt, E.M. and Cox, J., The Goal, North River Press.
  3. Jung, N.K., Case studies of TOC implementations, The Korean Operations Research and Management Science Society, 2006 Spring Conference.
  4. Kim, J.H., Hong, J.H., and Kim, H.J., A New DSM Administrative Structure for Efficient Implementation. The Korean Institute of Electrical Engineers, 2008, p 71-73.
  5. Kim, K.S., Park, J.I., and Park, C.S., A study on Changing Pattern of Short-run and Long-run Electricity Demand in Korea. The Korean Institute of Electrical Engineers, 2008, p 435-438.
  6. Kim, S.D., Kim, Y.S., and Lee, W.J., The effect of summer peak demand reduction programs. Environmental and Resource Economics Review, 2008, Vol. 17, No. 2, p 213-233.
  7. Ko, D.S., The implications of Real Time Pricing with U.S. case, Korea Institute for Industrial Economics and Trade, Issue Paper 2010-259.
  8. Koh, S.G. and Kim, J.H., Implementation of DBR System with Kanban in a Production Line of Static Demand. IE Interfaces, Vol. 15, No. 1, p 99-106.
  9. Lee, D.W., ECA Rule Based Lighting Control System for Energy Saving. The Korean Institute of Information Technology, Vol. 22, No. 12, p 1-12.
  10. Lee, G.D., Strengthening of power demand management for power supply demand stability. Journal of the Electrical World, 2012, Special Issues 7.
  11. Ok, C.S. and Park, J.I., A Conceptual Approach for Managing Production in Consideration of Shifting Electrical Loads, Robotics and Computer Integrated Manufacturing, 2014 (Accepted).
  12. Park, J.J., Kim, H.W., and Kim, J.O., A Study on the Participation depending on the rebate changes in the DSM, Journal of Korean Institute of Illuminating and Electrical Installation Engineers, Vol. 22, No 10, p 18- 23.
  13. https://www.kdrm.or.kr.
  14. http://www.kepco.co.kr.
  15. http://www.kpx.or.kr.