References
- Anderson, J. R., Bothell, D., Byrne, M. D., Douglass, S., Lebiere, C., and Qin, Y. (2004). "An integrated theory of the mind." Psychological Review, 111(4), 1036-1060. https://doi.org/10.1037/0033-295X.111.4.1036
- Ballard, G. (2000). "The last plannerTM system of production control." Doctoral dissertation, The University of Birmingham, Birmingham, UK.
- Ballard, G. (2005). "Construction: One type of project production system." I, Sydney, Australia.
- Banks, J., Carson, J., Nelson, B. L., and Nicol, D. (2004). Discrete-event system simulation, Prentice Hall.
- Cheng, M.-Y., Su, C.-W., and You, H.-Y. (2003). "Optimal project organizational structure for construction management." Journal of Construction Engineering and Management, 129(1), 70-79. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:1(70)
- Cobb, C. W., and Douglas, P. H. (1928). "A theory of production." The American Economic Review, 18(1), 139-165.
- Cornick, T. C., and Mather, J. (1999). Construction project teams : Making them work profitably, Thomas Telford, London.
- Flyvbjerg, B., Bruzelius, N., and Rothengatter, W. (2003). Megaprojects and risk : An anatomy of ambition, Cambridge University Press, New York.
- Fong, P. S. W., and Lung, B. W. C. (2007). "Interorganizational teamwork in the construction industry." Journal of Construction Engineering and Management, 133(2), 157-168. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(157)
- Gibson, G. E., Kaczmarowski, J. H., and Lore, H. E. (1995). "Preproject planning for capital facilities." Journal of Construction Engineering and Management, 121(3), 312-318. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:3(312)
- Halpin, D. W. (1973). "An investigation of the use of simulation networks for modeling construction operations." Doctoral dissertation, University of Illinois at Urbana-Champaign, Urbana, IL.
- Hong, Y., Song, S., and Lee, H. (2004). "Organizational approach for enhancing the performance of high-rise building projects." Proc., Korea Institute of Construction Engineering and Management Conference, 271-276.
- Jackson, M. O., and Watts, A. (2002). "The evolution of social and economic networks." Journal of Economic Theory, 106(2), 265-295. https://doi.org/10.1006/jeth.2001.2903
- Jackson, M. O., and Wolinsky, A. (1996). "A strategic model of social and economic networks." Journal of Economic Theory, 71(1), 44-74. https://doi.org/10.1006/jeth.1996.0108
- Jin, Y., and Levitt, R. E. (1996). "The virtual design team: A computational model of project organizations." Computational & Mathematical Organization Theory, 2(3), 171-195. https://doi.org/10.1007/BF00127273
- Lee, S., and Pena-Mora, F. (2007). "Understanding and managing iterative error and change cycles in construction." System Dynamics Review, 23(1), 35-60. https://doi.org/10.1002/sdr.359
- Lim, H., and Choi, Y. (2010). "Developing management method of project progress condition considering level of construction project organization." Journal of Architectural Institute of Korea, 17(10), 121-128.
- Macal, C. M., and North, M. J. (2005). "Tutorial on agent-based modeling and simulation." Proc., Winter Simulation Conference, 2-15.
- Morris, P. W. G., and Hough, G. H. (1987). The anatomy of major projects: A study of the reality of project management, Wiley, New York.
- North, M. J., and Macal, C. M. (2007). Managing business complexity: Discovering strategic solutions with agent-based modeling and simulation, Oxford University Press, Oxford; New York.
- Pena-Mora, F., and Park, M. (2001). "Dynamic planning for fast-tracking building construction projects." Journal of Construction Engineering and Management, 127(6), 445-456. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(445)
- Reagans, R., and Zuckerman, E. W. (2001). "Networks, diversity, and productivity: The social capital of corporate r&d teams." Organization Science, 12(4), 502-517. https://doi.org/10.1287/orsc.12.4.502.10637
- Rojas, E. M., and Mukherjee, A. (2006). "Multi-agent framework for general-purpose situational simulations in the construction management domain." Journal of Computing in Civil Engineering, 20(3), 165-176. https://doi.org/10.1061/(ASCE)0887-3801(2006)20:3(165)
- Son, J., and Rojas, E. M. (2011). "Impact of optimism bias regarding organizational dynamics on project planning and control." Journal of Construction Engineering and Management, 137(2), 147-157. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000260
- Song, S., Kim, W., and Lee, H. (2002). "Organizational changes through the innovation on construction management." Proc., Korea Institute of Construction Engineering and Management Conference, 323-326.
- Song, S., and Shin, H. (2010). "The sequential effects of the communication behaviors on project performance in construction projects." Journal of Korean Academy of Business Historians, 25(1)
- Suk, S., An, S., and Kang, K. (2005). "A model for assessing a level of construction field organization's ability to perform a construction project using analytic hierarchy process." Journal of Architectural Institute of Korea, 21(5), 143-150.
- Wasserman, S., and Faust, K. (1994). Social network analysis: Methods and applications, Cambridge University Press, Cambridge; New York.
Cited by
- Factors of Influencing the Communication of Building Construction Field Organizations vol.16, pp.2, 2016, https://doi.org/10.5345/JKIBC.2016.16.2.161
- An Agent-Based Modeling Approach for Estimating Inundation Areas over Time vol.17, pp.4, 2016, https://doi.org/10.6106/KJCEM.2016.17.4.020