References
- Bonvik, A. M., Dallery, Y. and Gershwin, S. B., "Approximate analysis of production system operated by a CONWIP/ finite buffer hybrid control policy", IJPR, Vol. 38, No. 13, pp. 2845-2869, 2000. https://doi.org/10.1080/00207540050117332
- Cook, D. P., "Simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks", Production and Inventory Management Journal, Vol. 35, pp. 73-78, 1994.
- Fredendall, L.D. and B.R. Lea, 1997. Improving the product mix heuristic in the theory of constraints, International Journal of Production Research, 35: 1535-1544. https://doi.org/10.1080/002075497195100
- Gilland, W., "A simulation study comparing performance of CONWIP and bottleneck-based release rules", Production Planning, Vol. 13, No. 2, pp. 211-219, 2002. https://doi.org/10.1080/09537280110069784
- Goldratt, E. M. and Cox, J., The Goal, Croton-on-Hudson, NY, North River Press, Inc., 1984.
- Goldratt, E. M. and Fox, R. E., The Race, Crotonon- Hudson, NY, North River Press, Inc., 1986.
- Jodlbauer, H. and Huber, A., "Service level performance of MRP, Kanban, CONWIP and DBR due to parameter stability and environmental robustness", IJPR, Vol. 46, No. 8, pp. 2179-2195, 2008. https://doi.org/10.1080/00207540600609297
- Kelton, et. al , Simulation with Arena, McGraw-Hill, International Edition 2010.
- Koh, S. G. and Bulfin, R. L., "Comparison of DBR with CONWIP in an Unbalanced Production Line with Three Stations", IJPR, Vol. 42, No. 2, pp. 391-404, 2004. https://doi.org/10.1080/00207540310001612026aa
- Lee, Hochang and Seo, Dong-Won, "Comparison of DBR with CONWIP in a Production line with Constant Processing Times", Journal of The Korea Society for Simulation, 12, 2012. https://doi.org/10.9709/JKSS.2012.21.4.011
- Muckstadt, J. A. and Tayur, S. R., "A comparison of alternative Kanban control mechanism: I. background and structural results", IIE Transaction, Vol. 27, pp. 140-150, 1995. https://doi.org/10.1080/07408179508936726
- Schragenheim, E. and Ronen, B., "Drum-buffer-rope shop floor control", Production Inventory Management Journal, Vol. 31, No. 3, pp. 18-22, 1990.
- Spearman, M. L., Woodruff, D. L. and Hopp, W. J., "CONWIP: a pull alternative to Kanban", IJPR, Vol. 28, No. 5, pp. 879-894, 1990. https://doi.org/10.1080/00207549008942761
- Spearman, M. L. and Zazanis, M. A., "Push and pull production systems: issues and comparisons", Operations Research, Vol. 40, No. 3, pp. 521-532, 1992. https://doi.org/10.1287/opre.40.3.521
- Spencer, M, S. and Cox, J, F., "Master production scheduling development in a theory of constrainst environment", Production and Inventory Management Journal, Vol. 36, NO. 1, pp. 80-94, 1995.