- Akkermann, J., Runte, T. and Krebs, D. (2009), "Ship lift at Three Gorges Dam, china-design of steel structures", Steel Constr., 2(2), 61-71. https://doi.org/10.1002/stco.200910009
- Chen, J.Z., Bao, G.J. and Ma, G.Y. (1996), "Chamber stability of hoisting fully balancing type vertical shiplift", Hydro-Science and Engineering, 4, 301-308.
- Cheng, G.D., Li, H.T. and Ruan, S.L. (2005), "Free vibration characteristics and stability analysis of shiplift System", J. Mech. Strength, 27(3), 276-281.
- Herwig, B. (2010), The new Ship's hoist Niederfinow, Wasser-und Schifffhrtsverwaltung des Bundes.
- Li, H.T. (2006), "Coupled dynamic problems of the Three Gorges shiplift", Doctoral Dissertation of Dalian University of Technology, China.
- Liao, L.K. and Shi, D.W. (1996), "Coupled vibration analysis of torsion of hoist and pitch of ship chamber of shiplift", Yangtze River, 27(9), 19-22.
- Liao, L.K. and Shi, D.W. (1996), "Analysis of motion stability of shiplifts in suspension state", Water Conserv.Elec.Power Mach., 6, 9-12.
- Niu, X.Q. and Song, W.B. (2007), Design of ship lock and shiplift, China Water Power Press, China.
- Niu, X.Q., Qin, L.M. and Yu, Q.K. (2011), "The design of gear-rack climbing type ship-lift of Three Gorges project", Eng. Sci., 13(7), 96-103.
- Schinkel, E. (2001), Schiffs Lift, Westfalisches Industriemuseum.
- Tang, G.J. (2009), "Investigation understandings of German shiplift technique and management", Port Waterw. Eng., 344(9), 1-4.
-
Wang, Y.X. and Hu, X.W. (2008), Overall design of 2
${\times}$ 500t vertical ship lift of ShuiKou hydraulic power station, Technology for Hydraulic Machinery Essay Collection in 2008. - Wu, X.N. and Yu, Q.K. (2003), Research project for comparison and selection of the plan of main parts of the Three Gorges shiplift, China Three Gorges Construction Yearbook.
- Wasser-und Schifffahrtsdirektion Ost (2005), "The Niederfinow boat lift", Eberswalde Office of Waterways and Shipping, www.wsa-eberswalde.de.
- Yang, C. and Zeng, X. (1992), "A study on integral dynamic characteristics of chamber of ship lift of the Three Gorges project", J. Yangtze River Sci. Res. Ins., 9(2), 12-20.
- Zhu, S.H., Zhou, C. and Liu, D.H. (2202), "Study on dynamic properties of ship-Lift during water-losing from ship chamber of Three Gorges project", J. Yangtze River Sci. Res. Ins., 19(3), 9-11.
피인용 문헌
- Stability and parameters influence study of fully balanced hoist vertical ship lift vol.66, pp.5, 2014, https://doi.org/10.12989/sem.2018.66.5.583
- Analytical solution of capsizing moments in ship chamber under pitching excitation vol.233, pp.15, 2019, https://doi.org/10.1177/0954406219843327
- Pitch stability analysis of high-lift wire rope hoist vertical shiplift under shallow water sloshing-structure interaction vol.233, pp.4, 2019, https://doi.org/10.1177/1464419319850666