DOI QR코드

DOI QR Code

여성복 재킷 생산라인의 라인 밸런싱에 관한 연구 - 공정편성 효율을 중심으로 -

A Study on 'Line Balancing' of Women's Jacket Production

  • 심규남 (국립목포대학교 의류학과) ;
  • 김진선 (대구미래대학교 웨딩이벤트학과) ;
  • 오지영 (국립목포대학교 의류학과) ;
  • 서은정 (국립목포대학교 의류학과)
  • Shim, Kue-Nam (Dept. of Clothing & Textiles, Mokpo National University) ;
  • Kim, Jin-Seon (Dept. of Weddingevent, Daegu Future College) ;
  • Oh, Ji-Yeong (Dept. of Clothing & Textiles, Mokpo National University) ;
  • Suh, Eun-Joung (Dept. of Clothing & Textiles, Mokpo National University)
  • 투고 : 2014.09.24
  • 심사 : 2014.11.20
  • 발행 : 2014.12.31

초록

This study establishes basic data for operations management by organizing processes and measuring time in the mini line for female jackets to improve productivity, ensure competitiveness, and maintain operator competency and the line process flow balance between apparel manufacturing companies. The results of this study are as follows. Sewing operations are divided into preparation functions, arrangement, partial tasks, and assembly that consist of 84 processes. The results from time measurement indicate that 3238.41seconds (sec) were required to produce a single jacket and that the average time required for operators was 231.32 sec. A control limit was established to increase the reliability of the measured value for net time. After outside values were removed, the operation time was measured to be 3176.35 sec. This accounted for 98.08% of the total operation time, with net time decreasing by 62.06. Skill and effort level coefficients were applied to measure the operator performance, the total real time was calculated to be 3415. The requirement for preparation and arrangement operations were 1233.35 sec, and 2182.22 sec for partial tasks and assembly operations. Process separation and organization were performed after the bottleneck operation was selected to identify the maximum line balance. Consequently, process efficiency of preparation and arrangement operations increased from 79.19% to 93.00%, and the partial tasks and assembly operations increased from 62.36% to 90.93%.

키워드

참고문헌

  1. Kim, H. S. (2010). (A) study on work management of mini-line system - Focus on women's jacket-. Unpublished doctoral dissertation, Seoul Women's University, Seoul.
  2. Kim, J. S., & Oh, S. (2009). Study on the production management of apparel firms and manufactures. Korea Society of Design Trend, 25, 23-34.
  3. Lee, S. H. (1998). A study on the manufacturing strategies and production systems of apparel manufacturers. Unpublished doctoral dissertation, Hanyang University, Seoul.
  4. Lee, S. W. (2000). 작업관리:이론과 실제 [Work management: The theory and practice of work study]. Seoul: Chungam media.
  5. Lee, W. J., & You, J. S. (2003). Development of the standard worksheet system for the quality risk management of apparel products. Journal of the Korean Society of Clothing and Textiles, 27(9/10), 1160-1171.
  6. Park, G. A., & Jo, J. S. (1997). A study on the production planning and management for automated clothing manufacture. Journal of the Korean Society of Clothing and Textiles, 21(1), 19-34.
  7. Park, J. E. (2002). Work management research for the improvement of needlework businesses in Korea. Unpublished doctoral dissertation, Sangmyung University, Seoul.
  8. Production Sheet (OLIVE DES OLIVE). (2013). style no. OW3AJ180-s.
  9. Yu, J. S. (2009). Apparel mamufacturing. Seoul: Khohak research.