Abstract
Since the rock fragmentation from a bench blasting can affect the subsequent processes including loading, hauling and crushing, its control is essential for the assessment of blasting efficiency as well as production cost. In this study, the delay time could be precisely controlled by using electronic detonators. The rock fragmentations resulted from the blastings with different delay times of 1, 2, 3, 4, 5, 7 and 10ms per each meter of burden were measured from full scale field tests in a limestone mine. The results showed that the optimum delay time for minimum fragmentation was approximately 6ms/m. From the analysis of fragmentation size distribution, it was possible to find that delay time can be a parameter on rock fragmentation and thus it would be possible to control rock fragmentation by adjusting delay time.
벤치발파에서 발파에 의한 암석의 파쇄입도는 적재, 운반과 파쇄로 이어지는 후속공정에 직접적으로 영향을 미치고 있다. 본 연구에서는 전자뇌관을 사용하여 정확한 지연시차를 구현하였으며, 각 발파공에 대해 저항선 m당 1, 2, 3, 4, 5, 7, 10ms의 지연시차를 적용하여 실규모 시험을 통해 암석 파쇄입도를 측정하였다. 그 결과, 석회석 광산에서 저항선을 기준으로 약 6ms/m의 지연시차가 최소의 파쇄입도를 가지는 것으로 측정되었다. 또한, 파쇄입도 분포 분석을 통해 지연시차가 암석의 파쇄입도에 변화를 줄 수 있는 요소로 정의될 수 있으며, 지연시차를 통해 파쇄입도를 조절 가능하다고 사료된다.