References
- A. Rezaian, "Time-cost-quality-risk of construction and development projects or investment". Middle-East Journal of Scientific Research, vol. 1, no. 2, pp. 218-223, 2011.
- M. Y. Cheng, H.-C. Tsai, E. Sudjono, "Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry", Expert Systems with Applications, vol. 37, pp. 4224-4231, 2010. https://doi.org/10.1016/j.eswa.2009.11.080
- Y. Al-Shanti, "A cost estimate system for Gaza Strip construction contractors", The Islamic University of Gaza Strip, Palestine, 2003.
- Y. Wang, C. Yu, H. Chan, "Predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models", International Journal of Project Management, vol. 30, pp. 470-478, 2012. https://doi.org/10.1016/j.ijproman.2011.09.002
- G.-H. Kim, S.-H. An, K.-I.Kang, "Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning", Building and Environment, vol. 39, pp. 1235-1242, 2004. https://doi.org/10.1016/j.buildenv.2004.02.013
- S. Elhag, H. Boussabaine, A. Ballal, "Critical determinants of construction tendering costs: quantity surveyors_ standpoint", International Journal of Project Management, vol. 23, no.7, pp. 538-545, 2005. https://doi.org/10.1016/j.ijproman.2005.04.002
- B. Verlinden, R. Duflou, D. Collin, D. Cattrysse, "Cost estimation for sheet metal parts using multiple regression and artificial neural networks: A case study", Journal of Construction Engineering and Management (ASCE), vol. 127, no. 2, pp. 93-100, 2007.
- J. Long, "Parameteric cost estimating in the new millennium", 2006.
- S. Cavalieri, P. Maccarrone, R. Pinto, "Parametric vs. neural network models for the estimation of production costs: a case study in the automotive industry", International Journal of Production Economics, vol. 91, pp. 165-177, 2004. https://doi.org/10.1016/j.ijpe.2003.08.005
- CEM, "Cost estimating manual for WSDOT projects", Washington State Department of Transport, 2008.
- H. Yaman, E. Tas, A building cost estimation model based on functional elements. Istanbul Technical University, Faculty of Architecture, Istanbul Turkey, ITU AIZ ,vol 4, no. 1, pp. 73-87, 2007.
- M. Gunaydin, Z. Dogan, "A neural network approach for early cost estimation of structural systems of buildings", International Journal of Project Management, vol. 22, pp. 595-602, 2004. https://doi.org/10.1016/j.ijproman.2004.04.002
- M. Arafa, M. Alqedra, "Early stage cost estimation of buildings construction projects using ANN", Journal of Artifical Intelligence, vol. 4, no. 1, pp. 63-75, 2011. https://doi.org/10.3923/jai.2011.63.75
- S., Dogan, "Using machine learning techniques for early cost estimation of structural systems of buildings", Izmir Institute of Technology, Izmir, 2005.
- I. ElSawy, H. Hosny, M. Abdel Razek, "A Neural network model for construction projects site overhead cost estimating in Egypt". International Journal of Computer Science Issues, vol. 8, no. 1, 2011.
- G. Weckman, H. Paschold, J. Dowler, H. Whiting, W. Young, "Using neural networks with limited data to estimate manufacturing cost", Journal of Industrial and Systems Engineering, vol. 3, no. 4, pp. 257-274, 2010.
- M.W. Emsley, D.J., Lowe, A.R. Duff, A.Harding, A. Hickson, "Development of Neural Networks to predict Total Construction Costs", Journal of Construction Management and Economics, Taylor and Francis Group Ltd., no. 20, pp. 456-472, 2002.
- C. Willmott, K. Matsuura, "Advantages of the mean absolute error (MAE) over the root mean square error (RMSE) in assessing average model performance", Climate Research, vol. 30, pp. 79-82, 2005. https://doi.org/10.3354/cr030079
- J. Principe, C. Lefebvre, G. Lynn, C. Fancourt, D. Wooten,"NeuroSolution Help" , NeuroDimension, Inc, 2010.
- T. Hegazy, A. Ayed, "Neural network model for parametric cost estimation of highway projects", Journal of Construction Engineering and Management, pp. 210-218, 1998.
- P. Kshirsagar, N. Rathod, "Artificial neural network" in MPGI National Multi Conference 2012 proceedings, International Journal of Computer Applications, Maharashtra, 2012.
- T. Hegazy, O. Moselhi, "Elements of cost estimation: "A survey in Canada and the United States", Cost Engineering, vol. 37, no.5, pp. 27-31, 1995.
- Z. Dindar, "Artificial neural networks applied to option pricing", University of the Witwatersrand, Johannesburg, 2004.
- P. Edara, "Mode choice modeling using artificial neural networks", Virginia Polytechnic Institute and State university, Virginia, 2003.
- N. Bakhary, K. Yahya, N. C. Nam, "Univariate artificial neural network in forecasting demand of low cost house in Petaling Jaya". Jurnal Teknologi, Vol. 40, pp. 67-75, 2004.
- P. Samphaongoen, "A Visual approach to construction cost estimating. Marquette University", Milwaukee, Wisconsin, 2010.
- A. Enshassi, S. Mohamed, I. Madi,. "Cost estimation practice in the Gaza Strip: A case study", The Islamic University Journal, vol. 15, no. 2, pp. 153-176, 2007.
- N. Sinclair, P. Artin, S. Mulford, "Construction cost data workbook", Conference on the International Comparison Program ,World Bank, Washington, D.C., 2002