DOI QR코드

DOI QR Code

Nitrogen and Phosphorus Removal from Domestic Wastewater by MLE Process Combined with Aluminum Corrosion Process

알루미늄 부식 반응조를 조합한 MLE공정에서 하수의 질소와 인 제거

  • Received : 2013.01.09
  • Accepted : 2013.05.27
  • Published : 2013.11.29

Abstract

The pilot plant experiment was performed to investigate phosphorus and nitrogen removal from domestic wastewater by MLE process combined with aluminum corrosion reactor. When operating 0.5Q and 1Q to internal recycle and sludge recycle in the MLE process, the effluent $COD_{Mn}$ concentration of internal recycle 0.5Q were higher than internal recycle 1Q, the removal efficiency rates of $NH_3$-N in the internal recycle 0.5Q were was higher than internal recycle 1Q. Denitrification rates were about 86.8% in internal recycle and sludge recycle 0.5Q. When operating 0.5Q to internal recycle and sludge recycle in the MLE process, the removal efficiency rates of total nitrogen was the highest. The removal efficiency rates of total phosphorus was about 91.5% in the aluminum corrosion reactor.

Keywords

References

  1. Cheong, K. H., Choi, H. I., Jung, O. J., 1999, Phosphorus removal by electrolysis with aluminium electrodes, Korean J. Environ. Health, 25, 70-76.
  2. Cheong, K. H., Choi, H. I., Jung, O. J., Jung, J. K., 2000, Phosphorus removal by electrolysis with aluminium electrodes, J. Environ. Sci. Int'l, 9(1), 95-99.
  3. Cheong, K. H., Choi, H. I., Jung, O. J., Park, S. I., Kim, W. H., 2005, Simultaneous removal of phosphorus and nitrogen by intermittently aerated activate sludge combined with aluminum corrosion, J. Environ. Sci. Int'l, 14(7), 675-681. https://doi.org/10.5322/JES.2005.14.7.675
  4. Cho, N. U., Lim, B. S., Oa, S. W., 2001, Comparison on nutrient removal of the MLE and A2/O process combined with intermittent aeration, JKSWW, 15(4), 325-333.
  5. Groterud, O., Smoczynski, L., 1986, Phosphorus removal from water by means of electrolysis, Water Res., 20(5), 667-669. https://doi.org/10.1016/0043-1354(86)90032-1
  6. Han, J. S., 2009, A study on the removal effect of ozonation pretreatment of livestock wastewater and internal recycle ratios in the MLE sewage treatment process, M. S. Dissertation, Catholic University, Seoul.
  7. Iyo, T., Yoshino, T., Seki, Y., Ohno, S., 1996, Basic performance of submerged biofilter using aluminum contact media, J. Water Waste, 38(8), 24-29.
  8. Iyo, T., Yoshino, T., Seki, Y., Ohno, S., 1996, Performance of a household wastewater treatment tank using aluminum biofilter media, J. Water Waste, 38(9), 24-32.
  9. Kim, J. T., 1999, Annotation for standard methods of water quality, 4st ed., Sin Gwang Inc.
  10. Kwak, D, H., Lee, K. H., Lee, K. S., Lee, K. W., Lee, K. S., Lee, S. H., Lee, C. K., Jang, I. S., Jun, T. S., Cheong, K. H., Cho, W. H., 2006, Water quality environmental engineering planning I, Dong Hwa Inc., 200-218.
  11. Metcalf & Eddy, 2004, Wastewater engineering treatment and reuse II, Jung, W. Y., Dong Hwae Inc., 1238-248.
  12. Park, S. I., Park, D. H., Cheong, K. H., Choi, H. I., Choi, H. Z., Choi, Y. S., 2011, Phosphorus removal from domestic wastewater by MLE process combined with aluminum corrosion process, Proceedings of the Korean Environmental Science Society Conference, 20, 158-160.