References
- Ahn T.H. and Min T.K., Project portfolio evaluation problem : Based on the multi-attribute evaluation using simulation. Journal of the Korea Management Engineers Society, 2008, Vol. 13, No. 1, p 247.
- Bae, S.H., A study on efficiency of progress management in construction project(master's thesis). Seoul Korea, Chung-Ang University, 1990.
- Barrie, D.S. and Paulson, B.C., Professional Construction Management, McGrawHill, 1992.
- Choi, Y.K., Construction progress measurement system by tracking the work-done performance. Korean Journal of Construction Engineering and Management, 2003, Vol. 4, No. 3.
- Choi, Y.K., Construction progress measurement system by integrating schedule and cost(dissertation), Seoul Korea, Seoul National University, 1999.
- Clark, F.D., Lorenzoni AB. Applied Cost Engineering, Marcel Dekker, 1997.
- Construction Industry Institute. Project Control for Construction, Publication, Austin, TX : Construction Industry Institute, 1987, p 6-5.
- Fleming, Q.W. and Koppleman, J.M., Earned Value Project Management. Project Management Institute, 1996.
- Jung, Y.S., Standardized Progress Measurement Package. Korea Institute of Construction Engineering and Management. The 5th Conference Proceeding, 2004, p 565-570.
- Kim, C.S. and Oh, H.S., Application of web service technology to project evaluation management. Journal of the Society of Korea Industrial and Systems Engineering, 2004, Vol. 27, No. 1, p 57.
- Korea Project Management Association, Project Management, Seoul, Korea, Dae-Young Sa, 2010, p 214.
- Lee, B.N., A methodological improvement study of progress measurement and progress payment methods in the construction project, Construction Economy Research Institute of Korea, 1997.
- Lee, S.H., A construction progress measurement method based on earned value management system(master's thesis). Seoul, Korea, Inha University, 2000.
- Project Management Institute, Practice Standard for Earned Value Management. Project Management Institute, 2005, p 10-11.
- Shin, H.P., An introduction to cost estimation for construction, Seoul, Korea, Construction Daily, 2001.
- Thoma, H.R., Mathews, C.T., An Analysis of the Methods for Measuring Construction Productivity. CII Source Document, 1986, Vol. 13.
- Won, D.S., Methods of establishing the optimal performance measurement baseline and evaluating the progress for implementing EVMS(master's thesis), Seoul, Korea, Seoul National University, 2002.
Cited by
- A Real-Time Physical Progress Measurement Method for Schedule Performance Control Using Vision, an AR Marker and Machine Learning in a Ship Block Assembly Process vol.20, pp.18, 2013, https://doi.org/10.3390/s20185386