References
- Abbas, S. and Scordelis, A.C. (1993), "Nonlinear geometric, material and time-dependent analysis of segmentally erected three-dimensional cable stayed bridges", UCB/SESM-93/09, University of California, Berkeley.
- Adanur, S., Gunaydin, M., Altunisik, A.C. and Sevim, B. (2012), "Construction stage analysis of Humber Suspension Bridge", Appl. Math. Model., 36(11), 5492-5505. https://doi.org/10.1016/j.apm.2012.01.011
- Altunisik, A.C., Bayraktar, A., Sevim, B., Adanur, S. and Domanic, A. (2010), "Construction stage analysis of Komurhan Highway Bridge using time dependent material properties", Struct. Eng. Mech., 36(2), 207-223. https://doi.org/10.12989/sem.2010.36.2.207
- Ates, S. (2010), "Numerical modelling of continuous concrete box girder bridges considering construction stages", Appl. Math. Model., 35(8), 3809-3820.
- Atmaca, B. and Ates, S. (2012), "Construction stage analysis of three-dimensional cable-stayed bridges", Steel Compos. Struct., 12(5), 413-426. https://doi.org/10.12989/scs.2012.12.5.413
- Bayraktar, A., Altunisik, A.C., Sevim, B., Turker, T., Domanic, A. and Tas, Y. (2009), "Vibration characteristics of komurhan highway bridge constructed with balanced cantilever method", J. Perform. Constr. Fac., 23(2) 90-99. https://doi.org/10.1061/(ASCE)0887-3828(2009)23:2(90)
- Bishara, A.G. and Papakonstantinou, N.G. (1990), "Analysis of cast-in-place concrete segmental cantilever bridges", J. Struct. Eng., ASCE, 116(5), 1247-1268. https://doi.org/10.1061/(ASCE)0733-9445(1990)116:5(1247)
- CEB-FIP Model Code (1990), Thomas Telford, London.
- Chiu, H.I., Chern, J.C. and Chang, K.C. (1996), "Long-term deflection control in cantilever prestressed concrete bridges I: Control method", J. Eng. Mech., ASCE, 12(6), 489-494.
- Cho, T. and Kim, T.S. (2008), "Probabilistic risk assessment for the construction phases of a bridge construction based on finite element analysis", Finite Elem. Anal. Des., 44(6-7), 383-400. https://doi.org/10.1016/j.finel.2007.12.004
- Cruz, P.J.S., Mari, A.R. and Roca, P. (1998), "Nonlinear time-dependent analysis of segmentally constructed structures", J. Struct. Eng., ASCE, 124(3), 278-288. https://doi.org/10.1061/(ASCE)0733-9445(1998)124:3(278)
- Daloglu, A.T. and Vallabhan, C.V.G. (2000), "Values of k for slab on winkler foundation", J. Geotech. Geoenviron., 126(5), 463-471. https://doi.org/10.1061/(ASCE)1090-0241(2000)126:5(463)
- Gunaydin, M., Adanur, S., Altunisik, A.C. and Sevim, S. (2012), "Construction stage analysis of fatih sultan mehmet suspension bridge", Struct. Eng. Mech., 42(4), 489-505. https://doi.org/10.12989/sem.2012.42.4.489
- Ketchum, M.A. (1986), "Redistribution of stresses in segmentally erected prestressed concrete bridges", Department of Civil Engineering, University of California, Berkeley, UCB/SESM-86/07.
- Kwak, H.G. and Son, J.K. (2002), "Determination of design moments in bridges constructed by balanced cantilever method", Eng. Struct., 24(5), 639-648. https://doi.org/10.1016/S0141-0296(01)00128-6
- Kwak, H.G. and Son, J.K. (2004), "Span ratios in bridges constructed using a balanced cantilever method", Eng. Struct., 18(10), 767-779.
- Limkatanyu, S., Kuntiyawichai, K., Spacone, E. and Kwon, M. (2012), "Natural stiffness matrix for beams on Winkler foundation exact force-based derivation", Struct. Eng. Mech., 42(1) , 39-53. https://doi.org/10.12989/sem.2012.42.1.039
- Mari, A.R. (2000), "Numerical simulation of the segmental construction of three dimensional concrete frames", Eng. Struct., 22, 585-596. https://doi.org/10.1016/S0141-0296(99)00009-7
- Pindado, S., Meseguer, J. and Franchini, S. (2005), "The influence of the section shape of box-girder decks on the steady aerodynamic yawing moment of double cantilever bridges under construction", J. Wind Eng. Ind. Aerod., 93(7), 547-555. https://doi.org/10.1016/j.jweia.2005.05.005
- Rosseland, S. and Thorsen, T.A. (2000), "The stolma Bridge: world record of free cantilevering", Proceeding of the 2nd International Symposium on Structural Lightweight Aggregate Concrete, Kristiansand, Norway, June.
- SAP2000 (2008), Integrated Finite Element Analysis and Design of Structures, Comput. Struct., Inc, Berkeley, California, USA.
- Somja, H. and Goyet, V.V. (2008). "A new strategy for analysis of erection stages including an efficient method for creep analysis", Eng. Struct., 30(10), 2871-2883. https://doi.org/10.1016/j.engstruct.2008.03.015
- Wang, P.H., Tang, T.Y. and Zheng, H.N. (2004), "Analysis of cable-satyed bridges during construction by cantilever methods", Comput. Struct., 82(4-5), 329-346. https://doi.org/10.1016/j.compstruc.2003.11.003
- Wolf, J.P. (1985), Dynamic Soil-Structure Interaction, Prentice-Hall, Inc., Englewood Cliffs, NJ, USA.
Cited by
- Construction stages analyses using time dependent material properties of concrete arch dams vol.14, pp.5, 2014, https://doi.org/10.12989/cac.2014.14.5.599
- Determination of structural behavior of Bosporus suspension bridge considering construction stages and different soil conditions vol.17, pp.4, 2014, https://doi.org/10.12989/scs.2014.17.4.405
- Contribution of local site-effect on the seismic response of suspension bridges to spatially varying ground motions vol.10, pp.5, 2016, https://doi.org/10.12989/eas.2016.10.5.1233
- Öngerilmeli ve Betonarme Kirişlerin Dinamik Karakteristiklerinin Karşılaştırılması vol.7, pp.1, 2013, https://doi.org/10.29130/dubited.421496
- A simplified frequency formula for post-tensioned balanced cantilever bridges vol.20, pp.7, 2013, https://doi.org/10.1007/s42107-019-00160-y