Abstract
There is a critically structural problem of scaffolding system when one of scaffold columns is remove to be used as a gangway for their temporary office in the structure before finishing all such as an apartment or office building. This is not used to checking to structurally checking at a construction site. This study is to find out which system at a site will be more effective and low-cost-high effectiveness of aluminum ladder, timber ladder, ${\phi}$1/2 inch steel pipe truss with a type of concave, convex warren truss ladders. Theses are structurally tested with horizontal set as a truss type with 1.8 meter long. Concentrated load has been loaded at the upper center of the system and checked its strain at the bottom center, using aluminum-use strain gage and steel-use gauge have been attached concave warren truss with diameter 1/2 inch has 14% stronger than convex truss. Convex truss has almost same strength as an aluminum ladder truss, it is found out.