Abstract
The purpose of this paper is to evaluate the performance of a Plug-In MCCB developed for rapid power supply restoration when the MCCB is installed in a power system and to verify its reliability. Since the developed 3 ${\Phi}$ 3 W Plug-In MCCB can be installed on and removed from a bus bar by one touch using a plug housed at the rear, it can be replaced in a short period of time. Therefore, it can quickly respond to the normalization of a power system. When the Plug-In MCCBB is installed on a bus bar, the resistance between each phase and plug was measured to be 0.46 $m{\Omega}$ in average. When the Plug-In MCCB is installed, the tension in the vertical direction was measured to be 112.78 N in average, which is greater than the tension of 50 N specified in the related regulation. The withstanding voltage tests performed 5 times repeatedly by applying 6 kV to the developed Plug-In MCCB for 60 seconds shows good withstanding voltage characteristics. In addition, both the general waterproof test using a water injection method and the insulation resistance analysis using a Mega meter showed good waterproof and insulation characteristics.