References
- Bae, Y.I., Lee, C.H. and Park, C.S., 2009, Competitiveness of the Shipbuilding Industry Diagnosis of Korea, CEO Information, 690.
- Lee, J.M., Cho, S.W., Choi, Y.R. and Shin, J.G., 2006, A Development of Planning Evaluation Framework for Large Scale Shipyard, Proceedings of the Korean Institute of Industrial Engineers, Fall, (http://www.kiie.org).
- Cho, K.K., Oh, S.C. and Yang, T.Y., 1985, Operations Scheduling for Multi-item, Small-sized Production, Journal of the Korean Institute of Industrial Engineers, 11(2), Dec., pp.57-73.
- Lee, S.W. and Kim, H.J., 1995, Erection Process Planning & Scheduling using Genetic Algorithm, Transactions of the Society of Naval Architecture of Korea, 32(1), pp.9-16.
- Koh, S.G., 1996, A Production Schedule with Genetic Algorithm in Block Assembly Shop, Journal of the Korean Operations Research and Management Science Society, 13(1), pp.1-12.
- Yoon, D.Y. and Kim, K.C., 1993, Concept Establishment for Developing Process Planning/Scheduling Support System, Transactions of the Society of Naval Architecture of Korea, 30(4), pp.37-40.
- Kim, H.S., Lee, D.H., Bang, K.W., Cheon, H.K. and Kwak, I.S., 2010, Establishing Execution Schedule System in Shipbuilding Industry, Proceedings of the Korean Institute of Industrial Engineers, Fall, (http://www.kiie.org).
- Panetto, H., Baina, S. and Morel, G., 2007. Mapping the IEC 62264 Models onto the Zachman Framework for Analysing Products Information Traceability: a Case Study, Journal of Intelligent Manufacturing, 18(6), pp.679-698. https://doi.org/10.1007/s10845-007-0040-x
- Koronios, A., Nastasie, D., Chanana, V. and and Haider, A., 2007. Integration Through Standards - An Overview of International Standards for Engineering Asset Management. 2nd World Congress on Engineering Asset Management and the Fourth International Conference on Condition Monitoring, Harrogate, United KingDom, pp.11-14.
- Karnouskos, S., Baecker, O., De Souza, L.M.S. and Spiess, P., 2007. Integration of SOA-Ready Networked Embedded Devices in Enterprise Systems via a Cross-Layered Web Service Infrastructure, 12th IEEE Conference on Emerging Technologies and Factory Automation, Cagliari, Italy, pp.293-300.
- Kong, M.D., 2011. A Study on the Efficient MES Using Automation in Automotive Module Assembly Line, Journal of the Korea Academia-Industrial Cooperation Society, 12(10), pp.4618-4625. https://doi.org/10.5762/KAIS.2011.12.10.4618
- Cheon, B.S., 2004, NET Enterprise System Object-Oriented CBD Development Methodology, Young-Jin.com, Seoul, Korea, ISBN:9788931428780.
- Woo, J.H., Lee, K.K., Jung, H.R., Kwon, Y.D. and Shin, J.G.., 2005, A Framework of Plant Simulation for a Construction of a Digital Shipyard, Journal of the Society of Naval Architects of Korea, 42(2), pp.165-174. https://doi.org/10.3744/SNAK.2005.42.2.165
- Lee, K., Shin, J.G. and Ryu, C., 2009, Development of Simulation Based Production Execution System in a Shipyard: A Case Study for a Panel Block Assembly Shop, Production Planning & Control, 20(8), pp.750-768. https://doi.org/10.1080/09537280903164128