A Study on the Maintenance Plan Considering Maintenance Cycle of Wind Turbine Component

각 컴포넌트 유지보수 주기를 고려한 풍력발전 설비의 유지보수 계획에 관한 연구

  • Received : 2013.01.10
  • Accepted : 2013.04.10
  • Published : 2013.05.31

Abstract

Wind power is one of the fastest growing renewable energy sources. In these days, wind turbine shifts from onshore to offshore because the offshore wind farm has a abundant wind resource. However, offshore wind turbine is not easy to access, it has a long downtime when the failures of the wind turbine component occur. Therefore, the appropriate wind turbine maintenance plan is required to meet the economic and reliability of the components. This paper proposes the maintenance planning method based on the RCM(Reliability Centered Maintenance) to determine an economical maintenance cycle to satisfy the appropriate reliability of the wind turbine components. In order to compare the proposed method with the conventional RCM method, critical components are selected in the case study because they have a long downtime and a large amount of total cost.

Keywords

References

  1. Julia Nilsson, Lina Bertrling, "Maintenance Management of Wind Power Systems Using Condition Monitoring Systems-Life Cycle Cost Analysis for Two Case Studies" IEEE Transaction On Energy Conversion, VOL.22, NO.1, 2007.
  2. Roy Billinton, Ronald N.Allan, "Reliability Evaluation of engineering Systems", 2nd edition, New York: plenum press, 1992.
  3. Muthanna A. Aziz, Hassan Noura, Abbas Fardoun, "General review of fault diagnostic in wind turbine", 18th Mediterranean Conference on Control & Automation, 2010.
  4. Wenxian Yang, Jiecheng Jiang, "Wind Turbine Condition Monitoring and Reliability Analysis by SCADA Information", International Conference on Mechanic Automation and Control Engineering, 2011.
  5. Francois Besnard, Julia Nilsson, Lina Bertling, "On the Economic Benefits of using Condition Monitoring Systems for Maintenance Management of Wind Power Systems", International Conference on Probabilistic Methods Applied to Power Systems, 2010.
  6. GU Yujiong, You Lianhuan, "Optimization on Maintenance Cycle for Power Plant Equipment Based on Probabilistic Risk Assessment", International Technology and Innovation Conference, 2006.
  7. Yan ru Wu, Hong shao Zhao, "Optimization Maintenance of Wind Turbines Using Markov Decision Processes", International Conference on Power System Technology, 2010.
  8. J, Moubray, "Reliability-Centered Maintenance," 2nd Edition, Butterworth-Heinemann, 1999.
  9. Neil Bloom, "Reliability-Centered Maintenance (RCM)", McGraw-Hill, 2005.