참고문헌
- Bubshalt, A.A. and Al-Gobali, K.H. (1996), "Contractor prequalification in Saudi Arabia," Journal of Management in Engineering, ASCE, 12(2), 50-54.
- Chen, C.W., Wang, M.H.L. and Lin, J.W. (2009), "Managing target the cash balance in construction firms using a fuzzy regression approach", International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, 17(5), 667-684. https://doi.org/10.1142/S0218488509006200
- Edum-Fotwe, F., Price, A. and Thorpe, A. (1996), "A review of financial ratio tools for contractor insolvency", Construction Management and Economics, 14, 189-198. https://doi.org/10.1080/014461996373458
- Esfahanipour, A. and Aghamiri, W. (2010), "Adapted neuro-fuzzy inference system on indirect approach TSK fuzzy rule base for stock market analysis", Expert Systems with Applications, 37, 4742-4748. https://doi.org/10.1016/j.eswa.2009.11.020
- Hong, J.Y. (2007), "Fuzzy neural network model for estimating project indirect cost ratio", Master Thesis, Department of Construction Engineering, National Kaohsiung First University of Science and Technology, Taiwan. (In Chinese)
-
Hsiao, F.H., Chiang, W.L. and Chen, C.W. (2003), "Application and fuzzy
$H^{{\infty}}$ control via T-S fuzzy models for nonlinear time-delay systems", International Journal on Artificial Intelligence Tools, 12(2), 117-137. https://doi.org/10.1142/S0218213003001174 - Kim, C.W., Kawatani, M., Ozaki, R. and Makihata, N. (2011), "Recovering missing data transmitted from a wireless sensor node for vibration-based bridge health monitoring", Structural Engineering and Mechanics, 38(4), 417-428. https://doi.org/10.12989/sem.2011.38.4.417
- Klir, G.J. and Yuan, B. (1995), Fuzzy Sets and Fuzzy Logic Theory and Applications, Prentic-Hall, Englewood Cliffs, NJ.
- Li, S.J., Suzuki, Y. and Noori, M.N. (2004), "Improvement of parameter estimation for non-linear hysteretic systems with slip by a fast Bayesian bootstrap filter", International Journal of Nonlinear Mechanics, 39(9), 1435-1445. https://doi.org/10.1016/j.ijnonlinmec.2004.02.005
- Lin, J.W. (2001), "Adaptive algorithms for the identification of nonlinear structural systems", Ph.D. Dissertation, Columbia University, New York.
- Lin, J.W. (2012), "Fuzzy regression decision systems for assessment of the potential vulnerability of bridge to earthquakes", Natural Hazards, 64(1), 211-221. https://doi.org/10.1007/s11069-012-0230-5
- Lin, J.W., Betti, R., Smyth, A.W. and Longman, R.W. (2001), "On-line identification of non-linear hysteretic structural systems using a variable trace approach", Earthquake Engineering and Structural Dynamics, 30(9), 1279-1303. https://doi.org/10.1002/eqe.63
- Lin, J.W. and Betti, R. (2004), "On-line identification and damage detection in non-linear structural systems using a variable forgetting factor approach", Earthquake Engineering and Structural Dynamics, 33(4), 419-444. https://doi.org/10.1002/eqe.350
- Lin, J.W., Chen, C.W. and Hsu, T.C. (2012), "Fuzzy statistical refinement for the forecasting of tenders for roadway construction", Journal of Marine Science and Technology, 20(4), 410-417.
- Lin, J.W. and Chen, H.J. (2009), "Repetitive identification of structural systems using a nonlinear model parameter refinement approach", Shock and Vibration, 16(3), 229-240. https://doi.org/10.1155/2009/174917
- Mikut, R., Jäkel, J., Groll, L. (2005), "Interpretability issues in data-based learning of fuzzy systems", Fuzzy Sets and Systems, 150(2), 179-197. https://doi.org/10.1016/j.fss.2004.06.006
- Niimura, T. and Nakashima, T. (2001), "Deregulated electricity market data representation by fuzzy regression models", IEEE Trans. Syst., Man, Cybern., 31, 320-326. https://doi.org/10.1109/5326.971659
- Russell, J.S. and Skibniewwski, M.J. (1988), "Decision criteria in contractor prequalification", Journal of Management in Engineering, ASCE, 4(2), 148-164. https://doi.org/10.1061/(ASCE)9742-597X(1988)4:2(148)
- Shakouri, H., Nadimi, R., and Ghaderi, F. (2009), "A decision support tool for apparel coordination through integrating the knowledge-based attribute evaluation expert system and the T-S fuzzy neural network", Expert Systems with Applications, 36, 2377-2390. https://doi.org/10.1016/j.eswa.2007.12.068
- Smyth, A.W., Masri, S.F., Chassiakos, A.G. and Caughey, T.K. (1999), "On-line parametric identification of MDOF nonlinear hysteretic systems", Journal of Engineering Mechanics, 125, 133-142. https://doi.org/10.1061/(ASCE)0733-9399(1999)125:2(133)
- Takagi, T. and Sugeno, M. (1985), "Fuzzy identification of systems and its applications to modeling and control", IEEE Transactions on Systems, Man and Cybernetics, 15(1), 116-132.
- Tarawneh, S.A. (2004), "Evaluation of pre-qualification criteria: client perspective; Jordan case study", Journal of Applied Sciences, 4(3), 354-363. https://doi.org/10.3923/jas.2004.354.363
- Xu, Y. and Chen, J. (2012), "Fuzzy control for geometrically nonlinear vibration of piezoelectric flexible plates", Structural Engineering and Mechanics, 43(2), 163-177. https://doi.org/10.12989/sem.2012.43.2.163
- Yan, Z.X. (2006), "Application of fuzzy set theory for evaluation of construction alternatives for private schools", Master Thesis, Department of Construction Engineering, National Kaohsiung First University of Science and Technology, Taiwan. (In Chinese)
- Zadeh, L.A. (1965), "Fuzzy sets", Information and Control, 8, 338-353. https://doi.org/10.1016/S0019-9958(65)90241-X
피인용 문헌
- Repetitive model refinement for structural health monitoring using efficient Akaike information criterion vol.15, pp.5, 2015, https://doi.org/10.12989/sss.2015.15.5.1329
- Detection and parametric identification of structural nonlinear restoring forces from partial measurements of structural responses vol.54, pp.2, 2015, https://doi.org/10.12989/sem.2015.54.2.291
- Experimental modeling and evaluation of the afterglow phosphors using multiple single exponential equations vol.148, 2015, https://doi.org/10.1016/j.neucom.2014.06.064
- Online estimation of noise parameters for Kalman filter vol.47, pp.3, 2013, https://doi.org/10.12989/sem.2013.47.3.361
- Factor-analysis based questionnaire categorization method for reliability improvement of evaluation of working conditions in construction enterprises vol.51, pp.6, 2014, https://doi.org/10.12989/sem.2014.51.6.973