DOI QR코드

DOI QR Code

DETERMINISTIC EVALUATION OF DELAYED HYDRIDE CRACKING BEHAVIORS IN PHWR PRESSURE TUBES

  • Oh, Young-Jin (Power Engineering Research Institute, KEPCO Engineering and Construction) ;
  • Chang, Yoon-Suk (Department of Nuclear Engineering, Kyung Hee University)
  • Received : 2012.04.16
  • Accepted : 2012.10.31
  • Published : 2013.04.25

Abstract

Pressure tubes made of Zr-2.5 wt% Nb alloy are important components consisting reactor coolant pressure boundary of a pressurized heavy water reactor, in which unanticipated through-wall cracks and rupture may occur due to a delayed hydride cracking (DHC). The Canadian Standards Association has provided deterministic and probabilistic structural integrity evaluation procedures to protect pressure tubes against DHC. However, intuitive understanding and subsequent assessment of flaw behaviors are still insufficient due to complex degradation mechanisms and diverse influential parameters of DHC compared with those of stress corrosion cracking and fatigue crack growth phenomena. In the present study, a deterministic flaw assessment program was developed and applied for systematic integrity assessment of the pressure tubes. Based on the examination results dealing with effects of flaw shapes, pressure tube dimensional changes, hydrogen concentrations of pressure tubes and plant operation scenarios, a simple and rough method for effective cooldown operation was proposed to minimize DHC risks. The developed deterministic assessment program for pressure tubes can be used to derive further technical bases for probabilistic damage frequency assessment.

Keywords

References

  1. IAEA, IAEA TECDOC-1037, "Assessment and management of ageing of major nuclear power plant components important to safety : CANDU pressure tubes", 1998.
  2. Canadian Standards Association, CSA N285.4-05, "Periodic inspection of CANDU nuclear power plant components", 2005.
  3. AECL, COG-91-66, "Fitness for service guideline for zirconium alloy pressure tubes in operating CANDU reactors", Rev. 0, 1991.
  4. AECL, COG-91-66, "Fitness for service guideline for zirconium alloy pressure tubes in operating CANDU reactors", Rev. 1, 1996.
  5. AECL, COG-96-651, "Technical basis for the fitness for service guidelines for zirconium alloy pressure tubes in operating CANDU reactors", Rev. 0, 1996.
  6. Canadian Standards Association, CSA N285.8-05, "Technical requirements for in-service evaluation of Zirconium alloy pressure tubes in CANDU reactors", 2005.
  7. Canadian Standards Association, CSA N285.8-10, "Technical requirements for in-service evaluation of Zirconium alloy pressure tubes in CANDU reactors", 2010.
  8. K.H. Lee, Y.J. Oh, H.B. Park, H.S. Chung, H.J. Chung and Y.J. Kim, "Stress intensity factors for axial cracks in CANDU reactor pressure tubes", Transactions of KPVP, Vol.7, No.1, 2011.
  9. J.S. Kim, J.S. Seo, Y.J. Oh and H.B. Park, "Study for elastic stress concentration factors at volumetric flaws of CANDU pressure tubes", Proceedings of 2010 KPVP annual conference, 2010.
  10. Private communication with KHNP engineers, 2009.
  11. AECL, 86-31100-SR-001 Rev. 1, "Design report - fuel channel stress analysis, Wolsong NPP 234", 1996.
  12. IAEA, IAEA TECDOC-1410, "Delayed hydride cracking in Zirconium alloys in pressure tube nuclear reactors", 2004.
  13. Y.S. Kim, "Driving force for delayed hydride cracking of Zirconium alloys", Metals and Materials International, Vol.11, No.1, pp. 29-38, 2005. https://doi.org/10.1007/BF03027481
  14. G.K. Shek and J. Cui, "Effects of hydrided region overload on delayed hydride cracking initiation from flaws in Zr-2.5Nb pressure tubes", Proceedings of ASME PVP, 2003.
  15. J. Cui and G.K. Shek, "Overload fracture of hydrided region at simulated blunt flaws in Zr-2.5Nb pressure tube material", Proceedings of ASME PVP, 2005.
  16. G.K. Shek, J. Cui and V. Perovic, "Overload fracture of flaw tip hydrides in Zr-2.5Nb pressure tubes", Journal of ASTM International, Vol.2, No.4, pp. 729-758, 2005.
  17. J. Cui and G.K. Shek, "Examination of parameters affecting overload fracture behavior of flaw-tip hydrides in Zr-2.5Nb pressure tubes in CANDU reactors", Proceedings of ICAPP, 2007.