Abstract
The study proposes to draw out the correlation on what kinds of influences local government personnel's performance capability affect the overall quality of the project, and to suggest institutional supplement policies. For the study, two analytical methods are conducted. First, a hypothesis per each factor was set by classifying the factors which affect the personnel's performance capability into organizational and individual factors. Second, a survey was conducted targeting the project management personnels and presented the result on the verification of the hypothesis through statistic techniques. As the result, it is considered that the quality of forest tending project is more affected by the individual factors than the organizational factor, thereby this study suggests the methods of reinforcement in project management personnel's performance capability.