References
- Moon, D. H. and Chang, K. K., 2000, A Simulation Model for Supporting System Design of Tire Manufacturing System, Korean Simulation Association, Vol.9 No.2, pp. 27-38.
- Carlier, J. and Pinson, E., 1989, An Algorithm for Solving the Job-shop Problem, Management Science, Vol. 35, No. 2, pp. 164-176. https://doi.org/10.1287/mnsc.35.2.164
- Joseph Adams, Egon Balas, and Daniel Zawack- Reviewed, 1988, The Shifting Bottleneck Procedure for Job Shop Scheduling, Management Science, Vol. 34, No. 3, pp. 391-401. https://doi.org/10.1287/mnsc.34.3.391
- Kenneth R. Baker, 1974, Introduction to Sequencing and Scheduling, John Wiley & Sons, Inc, pp. 178-210.
- Nabil Nasr and Elsayed, E. A., 1990, Job Shop Scheduling with Alternative Machines, International Journal of Production Research, Vol. 28, No. 9, pp. 1595-1609. https://doi.org/10.1080/00207549008942818
- Park, J.-H., Choi, Hoeryron and Kim, Y. H., 1998, A Genetic Algorithm Approach to Job Shop Scheduling Considering Alternative Process Plans, Journal of the Korean Institute of Industrial Engineers, Vol. 24, No. 4 pp. 130-145.
- Moon, I. K., Lee, S. H. and Bae, H. R., 2008, Genetic Algorithms for Job Shop Scheduling Problems with Alternative Routings, International Journal of Production Research, Vol. 46, No. 10, pp. 2695-2705. https://doi.org/10.1080/00207540701244820
- Hong Zhou, Yuncheng Feng, and Limin Han, 2001, The Hybrid Heuristic Genetic Algorithm for Job Shop Scheduling, Computers & Industrial Engineering,Vol. 40, No. 3, pp. 191-200. https://doi.org/10.1016/S0360-8352(01)00017-1
- Park, S. J., Kim, J. W. and Kim, H. W., 1996, Heuristic Knowledge Representation of Production Scheduling: An Integrated Modeling Approach, Expert System With Applications, Vol. 10, No. 3, pp. 325-339. https://doi.org/10.1016/0957-4174(96)00011-5
- Chung, J. B. and Yoon, J. H. 2009, The Implementation of a Production Planning System in a Tire Manufacturing Company: Case Study, Entrue Journal of Information Technology, Vol. 8, No. 1.
- http://www.eng.buffalo.edu/Courses/ce435/2001ZGu/ Firestone_Tires/FirestoneTiresReport.htm
- Kim, H. W., Kim, T., Cho, J. G. and Moon, S. S., 2000, Tire Engineering, Goldenbell, pp. 64-65.
- Lee, S. Y., 2010, The World of Artificial Intelligence, 21centries, pp. 400-410.
- Jeong, Y. S., Yim, H. J. Jee, H. S. and Lee, K. K., 2008, Manufacturing Line Optimization for Discrete Event Simulation and Genetic Algorithm, Transactions of the Society of CAD/CAM Engineers, Vol. 13, No. 1, pp. 67-75.
- Cheng, R. and Gen, M., 1997, Resource Constrained Project Scheduling Problem Using Genetic Algorithms, International Journal of Intelligent Automation and Soft Computing, Vol. 3, No. 3, pp. 273-286. https://doi.org/10.1080/10798587.1997.10750708