References
- Alidaee, B. and N.K. Womer, "Scheduling with time dependent processing times : review and extensions," Journal of the Operational Research Society, Vol.50, No.7(1999), pp.711-721. https://doi.org/10.1057/palgrave.jors.2600740
- Bachman, A., A. Janiak, and M.Y. Kovalyov, "Minimizing the total weighted completion time of deteriorating jobs," Information Processing Letters, Vol.81, No.2(2002), pp.81- 84. https://doi.org/10.1016/S0020-0190(01)00196-X
- Bahalke, U., A.M. Yolmeh, and K. Shahanaghi, "Meta-heuristics to solve single-machine scheduling problem with sequence-dependent setup-time and deteriorating jobs," International Journal of Advanced Manufacturing Technology, Vol.50(2010), pp.749-759. https://doi.org/10.1007/s00170-010-2526-5
- Browne, S. and U. Yechiali, "Scheduling deteriorating jobs on a single processor," Operations Research, Vol.38(1999), pp.495-498.
- Cheng, T.C.E. and Q. Ding, "Single machine scheduling with deadlines and increasing rates of processing times," Acta Informatica, Vol.36(2000), pp.673-692. https://doi.org/10.1007/s002360050170
- Cheng, T.C.E., Q. Ding, and B.M.T. Lin, "A concise survey of scheduling with time-dependent processing times," European Journal of Operational Research, Vol.152(2004), pp.1-13. https://doi.org/10.1016/S0377-2217(02)00909-8
- Gen, M. and R. Cheng, Genetic Algorithms and Engineering Optimization, New York: Wiley, 2000.
- Gupta, J.N.D. and S.K. Gupta, "Single facility scheduling with nonlinear processing times," Computers and Industrial Engineering, Vol. 14(1988), pp.387-393. https://doi.org/10.1016/0360-8352(88)90041-1
- Holland, J.H., Adaptation in natural and artificial systems, Ann Arbor, IL : University of Michigan Press, 1975.
- Husang, H., J. Wang, and X. Wang, "A generalization for single-machine scheduling with deteriorating jobs to minimize earliness penalties," International Journal of Advanced Manufacture Technology, Vol.47(2010), 1225-1230. https://doi.org/10.1007/s00170-009-2242-1
- Iranpoor, M., S.M.T. Ghomi, and M. Zandieh, "Machine scheduling in the presence of sequence- dependent setup times and a ratemodifying activity," International Journal of Production Research, Forthcoming, 2012.
- Jeng, A. and B. Lin, "Minimizing the total completion time in single-machine scheduling with step-deteriorating jobs," Computers and Operations Research, Vol.32(2005), pp. 521-536. https://doi.org/10.1016/j.cor.2003.08.001
- Joo, C.M. and B.S. Kim, "Genetic Algorithm with an Effective Dispatching Method for Unrelated Parallel Machine Scheduling with Sequence Dependent and Machine Dependent Setup Times," IE Interface, Vol.25, No.3(2012), pp.357-364. https://doi.org/10.7232/IEIF.2012.25.3.357
- Kim, B.S. and C.M. Joo, "Single-machine total completion time scheduling with position- based deterioration and multiple ratemodifying activities," Industrial Engineering and Management Systems, Vol.10, No.4 (2011), pp.247-254. https://doi.org/10.7232/iems.2011.10.4.247
- Lee, C.Y. and C.S. Lin, "Single-machine scheduling with maintenance and repair ratemodifying activities," European Journal of Operational Research, Vol.135(2001), pp.493- 513. https://doi.org/10.1016/S0377-2217(00)00322-2
- Lee, C.Y. and Z.L. Chen, "Scheduling of jobs and maintenance activities on parallel machines," Naval Research Logistics, Vol.47 (2000), pp.61-67.
- Lee, C.Y. and V.J. Leon, "Machine scheduling with a rate-modifying activity," European Journal of Operational Research, Vol. 128(2001), pp.119-128. https://doi.org/10.1016/S0377-2217(99)00066-1
- Lodree, E.J. and C.D. Geiger, "A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration," European Journal of Operational Research, Vol.201, No.2(2010), pp.644-648. https://doi.org/10.1016/j.ejor.2009.03.027
- Mosheiov, G. and A. Sarig, "Scheduling a maintenance activity and due-window assignment on a single machine," Computers and Operations Research, Vol.36 No.9(2009), pp. 2541-2545. https://doi.org/10.1016/j.cor.2008.10.007
- Mosheiov, G., "V-Shaped polices to scheduling deteriorating jobs," Operation Research, Vol.39(1991), pp.979-991. https://doi.org/10.1287/opre.39.6.979
- Qi, X., T. Chen, and F. Tu, "Scheduling the maintenance on a single machine," Journal of the Operational Research Society, Vol.50 (1999), pp.1071-1078. https://doi.org/10.1057/palgrave.jors.2600791
- Wang, D. and J. Wang, "Single-machine scheduling with simple linear deterioration to minimize earliness penalties," International Journal of Advanced Manufacture Technology, Vol.46(2010), pp.285-290. https://doi.org/10.1007/s00170-009-2086-8
- Wang, J.L., L. Sun, and L. Sun, "Singlemachine total completion time scheduling with a time-dependent deterioration," Applied Mathematical Modelling, Vol.35(2011), pp. 1506-1511. https://doi.org/10.1016/j.apm.2010.09.028
- Wu, C., Y. Shiau, L. Lee, and W. Lee, "Scheduling deteriorating jobs to minimize the makespan on a single machine," International Journal of Advanced Manufacture Technology, Vol.44(2009), pp.1230-1236. https://doi.org/10.1007/s00170-008-1924-4
- Zhao, C. and H. Tang, "A note to due-window assignment and single machine scheduling with deteriorating jobs and a ratemodifying activity," Computers and Operations Research, Vol.39, No.6(2012), pp.1300- 1303. https://doi.org/10.1016/j.cor.2010.04.006
- Zhao, C., H. Tang, and C. Cheng, "Two-parallel machines scheduling with rate-modifying activities to minimize total completion time," European Journal of Operational Research, Vol.198(2009), pp.354-357. https://doi.org/10.1016/j.ejor.2008.08.012