참고문헌
- Arbel, A. (1989), Approximate articulation of preference and priority derivation, European Journal of Operational Research, 43(3), 314-326.
- Arbel, A. and Vargas, L. G. (1999), Preference simulation and performance programming : robustness issues in priority derivation, European Journal of Operational Research, 43, 200-209.
- Arnold, J. R. T. (1992), Introduction to Materials Management, Prentice Hall, New Jersey.
- Banae Costa, C. A., Vansnick, J. C., and Vansnick (1999), The MAC BETH approach : basic ideas, software and application, N. Meskens, M. Roubens (Eds.), Advances in Decision Analysis, Kluwer Academic Publishers, Dordrecht, 131-157.
- Bareet, R. T. and Barman, S. (1986), A SLAMII simulation study of a simplified flow shop, Simulation, 47(5), 181-189. https://doi.org/10.1177/003754978604700502
- Blackstone, J. H. Phillips, D. T., and Hogg, G. L. (1982), A state of art survey of dispatching rules for manufacturing job shop operation, International journal of production research, 20(1), 27-45. https://doi.org/10.1080/00207548208947745
- Botta-Genoulaz, V. (2000), Hybrid flow shop scheduling with precedence constrains and time lags to minimize maximum lateness, International journal of production economics, 64(1-3), 101-111. https://doi.org/10.1016/S0925-5273(99)00048-1
- Braglia, M. and Petroni, A. (1999), Data envelopment analysis for dispatching rule section, production planning and control, 10(5), 454- 461. https://doi.org/10.1080/095372899232984
- Brah, S. A. and Loo, L. L. (1999), Heuristics for scheduling in a flow shop with multiple processors, European Journal of Operational Research, 113, 113-122. https://doi.org/10.1016/S0377-2217(97)00423-2
- Braman, S. (1997), Simple priority rule combinations : an approach to improve both flow time and tardiness, International journal of production research, 25, 2857-2870.
- Cha, Y. and Jung, M. (2003), Satisfaction assessment of multi-objective schedules using neural fuzzy methodology, International journal of production research, 41, 1831-1849. https://doi.org/10.1080/1352816031000074937
- Chan, F. T. S. and Chung, S. H. (2004), A multi-criterion genetic algorithm for order distribution in a demand driven supply chain, International Journal of Computer Integrated Manufacturing, 17, 339-351. https://doi.org/10.1080/09511920310001617022
- Chang, Y. L., Sueyoshi, T., and Sullivan, R. S. (1996), Ranking dispatching rules by data envelopment analysis in a job shop environment, IIE Transactions, 28, 631-642.
- Chen, L. H. and Chen, Y. H. (1996), A design procedure for robust job shop manufacturing system under a constraint using computer simulation experiments, Computers and Industrial Engineering, 30, 1-12.
- eM-plant User's Manual Version 5.5 (2001), Tecnomatix Technologies, Stuttgart, Germany.
- ExpertFit(R) User's Guide (1998), Averill M. Law and Associates, Tucson, AZ.
- Fanti, M. P., Maione, B., Naso, D., and Turchiano, B. (1998), Genetic multi-criteria approach to flexible line scheduling, International Journal of Approximate Reasoning, 19, 5-21. https://doi.org/10.1016/S0888-613X(98)00014-0
- Grabot, B. and Geneste, L. (1994), Dispatching rules in scheduling : a fuzzy approach, International journal of production research, 32, 903-915. https://doi.org/10.1080/00207549408956978
- Greco, S., Matarazzo, B., and Slowinski, R. (2002), Rough set methodology for sorting problems in presence of multiple attributes and criteria, European Journal of Operational Research, 138, 247-259. https://doi.org/10.1016/S0377-2217(01)00244-2
- Harris, J. M. and Roesch, E. B. (2001), US Passive Component Supplier, UBS Warburg LLC, New York.
- Holthaus, O. (1999), Scheduling in job shops with machine breakdowns : an experimental study, Computers and Industrial Engineering, 36, 137-162. https://doi.org/10.1016/S0360-8352(99)00006-6
- Hwang, C. L. and Yoon, K. P. (1981), Multiple Attribute Decision Making : Methods and Applications, Springer-Verlag, New York.
- Jayamohan, M. S. and Rajendran, C. (2000), A comparative analysis of two different approaches to scheduling in flexible flow shops, Production Planning and Control, 11, 572-580. https://doi.org/10.1080/095372800414133
- Kim, S. J., Kim, K. S., and Jang, H. (2003), Optimization of manufacturing parameters for a brake lining using Taguchi method, Journal of Materrials Processing Technology, 136, 202-208. https://doi.org/10.1016/S0924-0136(03)00159-6
- Kim, G., Park, C. K., and Yoon, P. (1997), Identifying investment opportunities for advanced manufacturing system with comparative-integrated performance Measurement, International Journal of Production Economics, 50, 23-33. https://doi.org/10.1016/S0925-5273(97)00014-5
- Kwong, C. K. and Bai, H. (2003), Determining the importance weights for the customer requirements in QFD using fuzzy AHP with an extent analysis approach, IIE Transactions, 35, 619-626. https://doi.org/10.1080/07408170304355
- LaForge, R. L. and Barman, S. (1989), Performance of simple priority rule combinations in a flow dominant shop, Production and Inventory Management Journal, 30, 1-4.
- Petroni, A. and Rizzi, A. (2002), A fuzzy logic based methodology to rank shop floor dispatching rules, International Journal of Production Economics, 76, 99-108. https://doi.org/10.1016/S0925-5273(01)00171-2
- Phadke, M. S. (1989), Quality Engineering Using Robust Design, Prentice Hall, London.
- Pinedo, M. (1995), Scheduling : Theory, Algorithms and Systems, Prentice Hall, New Jersey.
- Rajendran, C. and Holthaus, O. (1999), A comparative study of dispatching rules in dynamic flowshops and jobshops, European Journal of Operation Research, 116, 156-170. https://doi.org/10.1016/S0377-2217(98)00023-X
- Saaty, T. L. (1980), The Analytic Hierarchy Process : Planning, Priority Setting, Resource Allocation, McGraw-Hill, New York.
- Saaty, T. L. and Vargas, L. G. (1987), Uncertainty and rank order in the Analytic Hierarchy Process, European Journal of Operation Research, 32, 107-117. https://doi.org/10.1016/0377-2217(87)90275-X
- Salvador, M. S. (1973), A solution to a special case of flow-shop scheduling problem, in : S. E. Elmaghraby (Ed.), Symposium of the Theory of Scheduling and Applications, Springer-Verlag, New York, 83-91.
- Santos, D. L., Hunsucker, J. L., and Deal, D. E. (1996), An evaluation of sequencing heuristics in flow shops with multiple processors, Computers and Industrial Engineering, 30, 681-692. https://doi.org/10.1016/0360-8352(95)00184-0
- Sarper, H. and Heny, M. C. (1996), Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop, Omega, 24, 73-81. https://doi.org/10.1016/0305-0483(95)00049-6
- Song, Q. and Jamalipour, A. (2005), Network selection in an integrated wireless LAN and UMTS environment using mathematical modeling and computing techniques, IEEE Wireless Communications, 12, 42-48.
- Sugihara, K., Ishii, H., and Tanaka, H. (2004), Interval priorities in AHP by interval regression analysis, European Journal of Operation Research, 158, 745-754. https://doi.org/10.1016/S0377-2217(03)00418-1
- TORA version 2.0 provided by H. Taha (1997), Operations Research, sixth edition, Prentice Hall, New Jersey.
- Wild, R. H. and Pignatiello Jr., T. T. (1991), An experimental design strategy for designing robust systems using discrete-event simulation, Simulation, 57, 358-368. https://doi.org/10.1177/003754979105700603
- Yang, T. and Chou, P. (2005), Solving a multiresponse simulation-optimization problem with discrete variables using a multiple-attribute decision-making method, Mathematics and Computers in Simulation, 68, 9-21. https://doi.org/10.1016/j.matcom.2004.09.004
- Yang, T., Chen, M. C., and Hung, C. C. (2007), Multiple attribute decision- making methods for the dynamic operator allocation problem, Mathematics and Computers in Simulation, 73, 285-299. https://doi.org/10.1016/j.matcom.2006.04.002
- Yang, T., Kuo, Y., and Chang, I. (2004), Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors- a case study, International Journal of Production Research, 42, 4015-4030. https://doi.org/10.1080/00207540410001699381
- Yang, T., Kuo, Y., and Cho, C. (2007), A genetic algorithms simulation approach for the multi-criteria combinatorial dispatching decision problem, European Journal of Operation Research, 176, 1859-1873. https://doi.org/10.1016/j.ejor.2005.10.048
- Yang, T., Lee, R. S., and Hsieh, C. (2003), Solving a process engineer's manpower-planning problem using analytic hierarchy process, Production Planning and Control, 14, 266-272. https://doi.org/10.1080/0953728031000111496
- Yurdakul, M. and IC¸Y. T. (2005), Development of a performance measurement model for manufacturing companies using the AHP and TOPSIS approaches, International Journal of Production Research, 43, 4609-4641. https://doi.org/10.1080/00207540500161746