References
- Cain, M. (1994), The moment-generating function of the minimum of bivariate normal random variables, The American Statistician, 48(2), 124-125.
- Chao, S. L. and Lin Y. J. (2011), Evaluating advanced quay cranes in container terminals, Transportation Research Part E: Logistics and Transportation Review, 47(4), 432-445. https://doi.org/10.1016/j.tre.2010.12.002
- Daganzo, C. F. (1989), The crane scheduling problem, Transportation Research Part B: Methodological, 23(3), 159-175. https://doi.org/10.1016/0191-2615(89)90001-5
- Jung, D. H., Park, Y. M., Lee, B. K., Kim, K. H., and Ryu, K. R. (2006), A quay crane scheduling method considering interference of yard cranes in container terminals, In: MICAI 2006: Advances in Artificial Intelligence, Springer, Heidelberg, Germany, 461-471.
- Kim, K. H. and Park, Y. M. (2004), A crane scheduling method for port container terminals, European Journal of Operational Research, 156(3), 752-768. https://doi.org/10.1016/S0377-2217(03)00133-4
- Kim, K. H., Phan, T. M. H., and Woo, Y. J. (2012), New conceptual handling systems in container terminals, Industrial Engineering and Management Systems, 11(4), 299-309. https://doi.org/10.7232/iems.2012.11.4.299
- Lee, Y. J., Suh, J. H., Lee, J. W., Lee, S. G., and Lee, K. S. (2005), A design of high efficient gantry crane for ultra large container ship, Proceedings of the International Federation of Automatic Control World Congress, Prague, Czech Republic.
- Lim, A., Rodrigues, B., and Xu, Z. (2007), A m-parallel crane scheduling problem with a non-crossing constraint, Naval Research Logistics, 54(2), 115-127. https://doi.org/10.1002/nav.20189
- Lim, A., Rodrigues, B., Xiao, F., and Zhu, Y. (2004), Crane scheduling with spatial constraints, Naval Research Logistics, 51(3), 386-406. https://doi.org/10.1002/nav.10123
- Meisel, F. and Bierwirth, C. (2011), A unified approach for the evaluation of quay crane scheduling models and algorithms, Computers and Operations Research, 38(3), 683-693. https://doi.org/10.1016/j.cor.2010.08.001
- Phan, T. M. H and Kim, K. H. (2012), Estimating the cycle time of container handling in terminals, Information, 15(12C), 6077-6098.
- Peterkofsky, R. I. and Daganzo, C. F. (1990), A branch and bound solution method for the crane scheduling problem, Transportation Research Part B: Methodological, 24(3), 159-172. https://doi.org/10.1016/0191-2615(90)90014-P
- Vidovic, M. and Kim, K. H. (2006), Estimating the cycle time of three-stage material handling systems, Annals of Operations Research, 144(1), 181-200. https://doi.org/10.1007/s10479-006-0020-0
- Yang, K. H. (2012), The influence of the quay crane traveling time for the quay crane scheduling problem, Proceedings of the International Multi Conference of Engineers and Computer Scientists, Hong Kong.
Cited by
- A Model for Developing Existing Ports Considering Economic Impact and Network Connectivity vol.13, pp.7, 2013, https://doi.org/10.3390/su13073705
- Investigation of dynamics and power needs for container unloading from ship process vol.24, pp.1, 2021, https://doi.org/10.17531/ein.2022.1.11