DOI QR코드

DOI QR Code

Effects of Control of Dam Sedimentation by a Hydraulic Structure in a Reservoir

저수지내 수리구조물에 의한 퇴사량 제어 효과

  • Cho, Hong Je (Dept. of Civil & Environmental Eng. Ulsan Univ.) ;
  • Kang, Ho Seon (Dept. of Civil & Environmental Eng. Ulsan Univ.)
  • 조홍제 (울산대학교 공과대학 건설환경공학과) ;
  • 강호선 (울산대학교 대학원 건설환경공학과)
  • Received : 2013.09.23
  • Accepted : 2013.10.25
  • Published : 2013.12.31

Abstract

Sayeon dam is the one that is structured in 1965 and supplying residential water in Ulsan. The hill located within the reservoir near the entrance of the dam spillway plays a role as a natural Dike. According to the recent surveys on change of sediment and effective volume of water kept in store, the latter that decreased 2.92% from twenty million tons and the former increased just 1.65 m. In this survey we examined the application of SED-2D model using measured data of Sayeon dam sediment. In addition we surveyed the inflow control and the water depth to be kept when installing small hydraulic structure similar to Dike around the dam reservoir entrance. To do this, we simulated the hydraulic effects and sediment on the conditions eliminating the hill or installing the structure higher than it. The controlling effects of present hill or adding small hydraulic structure on it was found, though the changes of the measure was not large.

1965년 축조된 사연댐은 울산시의 중요한 생활용수 공급댐이며, 댐 여수로 입구 부근 저수지 내에 위치한 야산은 자연상태의 도수제(Dike) 역할을 하고 있다. 최근 두 차례에 걸쳐 조사하였던 퇴사량과 유효저수량 변화에 따르면, 유효저수량은 2,000만 톤에서 2.92% 감소하였고 여수로 부근에서의 퇴적수심은 평균 1.65m 증가에 불과한 것으로 나타났다. 본 연구에서는 사연댐 퇴사량 실측자료를 이용하여 SED-2D 모형의 적용성을 검토하고, 야산을 이용하여 취수탑이 있는 댐 주변의 저수지 입구에 도수제와 유사한 소규모 수리구조물을 설치할 때 퇴사의 유입억제와 취수에 필요한 수심확보 가능성을 검토하였다. 이를 위해 야산이 있는 현상태를 기준으로, 야산을 철거할 때와 추가로 구조물을 더 높게 설치할때 등을 고려하여 수리학적 효과와 그에 따른 퇴사량 감소 등을 모의 하였다. 그 결과 장기유출에 의한 50년 후 저수지내 퇴사 깊이는 평균 2.335~5.847m 발생하는 것으로 나타났으며, 그 값의 변화는 현재의 야산이나 소규모 수리구조물의 추가 설치시에 퇴사량의 제어효과가 있는 것으로 나타났다.

Keywords

References

  1. Ahn, J.H., Jang, S.H., Choi, W.S., and Yoon, Y.N. (2006). "An efficient management of sediment deposit for reservoir long-term operation (1)-Reservoir sediment estimation." J. of Korean Society on Water Quality, Vol. 22, No. 6, pp. 1088-1093.
  2. Bruk, S. (1985). Methods of computing sedimentation in lakes and reservoirs, UNESCO international hydrological programme. Paris.
  3. Fan. J., and Morris, G.L. (1992). "Reservoir sedimentation II : Reservoir desiltation and long-term storage capacity." J. Hydraul. Eng., Vol. 118, No. 3, pp. 370-384. https://doi.org/10.1061/(ASCE)0733-9429(1992)118:3(370)
  4. Jang, S.W., Hwang, P.S., Kim, K.H., and Shin, Y.H. (2012). A study on estimation method of sediment deposition rate of reservoir, 2012 Conference of Korea Water Resources Association, pp. 523-527.
  5. Kim, D.S. (2012). "Simulation of sediment deposition behavior in a reservoir using a SED2D model: Focusing on sensitivity of simulation time step." J. of Korean Society ofWater and Wastewater, Vol. 26, No. 1, pp. 87-95. https://doi.org/10.11001/jksww.2012.26.1.087
  6. Korea Water Resources Corporation(KWRC). (2005). Dam sediment survey and topographic map production.
  7. Lee, G.M., Darrell G., Fontane., and Yoo, Y.S. (1997). "Information variable dynamic programming for reservoir sedimentation management." J. of Korean Society of Civil Engineers, Vol. 17, No. II-2, pp. 119-128.
  8. Lee, G.M., and Lee, W.S. (1998). "Long-term prediction of dam sedimentation using sluicing efficiency curve and dam operation technique." J. of Korea Water Resources Association, Vol. 31, No. 1, pp. 95-103.
  9. Yoon, Y.N. (1988). "Reservoir sedimentation." J. of Korea Water Resources Association, Vol. 21, No. 1, pp. 9-15.