References
- A Grall, C B´erenguer, L Dieulle, "A condition-based maintenance policy for stochastically deteriorating systems", Reliability Engineering & System Safety, pp.167-180,Vol. 76, 2002. https://doi.org/10.1016/S0951-8320(01)00148-X
- J. Nilsson, L. Bertling, "Maintenance management of wind power systems using condition monitoring systems-life cycle cost analysis for two case studies", IEEE Transactions on Energy Conversion , pp.223- 229, Vol.22 , No.1, 2007. https://doi.org/10.1109/TEC.2006.889623
- D McMillan, G W Ault, "Condition monitoring benefit for onshore wind turbines: Sensitivity to operational parameters", IET Renewable Power Generation, pp.60-72, Vol.2, No.1, 2008. https://doi.org/10.1049/iet-rpg:20070064
- L. Bertling, R Allan, R. Eriksson, "A reliabilitycentered asset maintenance method for assessing the impact of maintenance in power distribution system", IEEE Transactions on Power Systems pp.75-82, Vol.20, No.1, 2005. https://doi.org/10.1109/TPWRS.2004.840433
- I P Siqueira., "Optimum reliability-centered maintenance task frequencies for power system equipments", 8th International Conference on PMAPS, 2004.
- P A Kuntz, R. D Christie, S S Venkata, "A reliability centered optimal visual inspection model for distribution feeders", IEEE Transactions on Power Delivery, pp.718-723, Vol.16, No.1, 2001 https://doi.org/10.1109/61.956761
- M E Beehler, "Reliability centered maintenance for transmission systems", IEEE Transactions on Power Delivery, pp.1023-1028, Vol.12, 1997. https://doi.org/10.1109/61.584432
- W Li, J Korczynski, "A reliability based approach to transmission maintenance planning and its application in BC Hydro system", IEEE Transactions on Power Delivery, Vol.19, No.1, 2004.
- G P Park, J H Heo, S S Lee, Y T Yoon, "Generalized reliability centered maintenance modeling through modified Markov chain in power system", Journal of Electrical Engineering & Technology, pp.25-31, Vol.6, No.1, 2011. https://doi.org/10.5370/JEET.2011.6.1.025
- G Hoff, H G Kranz, "On-site dielectric diagnostics of power cables sing the Isothermal Relaxation Current Measurements", IEEE/PES Panel on Diagnostic Measurement Techniques for Power Cables, 2000.
- J Kennedy, R Eberhart, "Particle swarm optimization", Proceedings of IEEE conference on neural networks Piscataway NJ, pp.1942-1948, Vol.4, 1998.
- Eberhart, Y Shi, "Particle swarm optimization: developments, applications and resources", Proceedings of the Congress Evolutionary Computation, pp.81-86, Vol.1, 2001.
- K Y Lee, M A El-sharkawi, "Modern Heristic Optimization Technique with Applications to Power Systems", IEEE Power Engineering Society (02TP160), 2002.
- H Yoshida, K Kawata, Y Fukuyama, S. Takayama, Y. Nakanishi, "A particle swarm optimization for reactive power and voltage control considering voltage security assessment", IEEE Transactions on Power System, pp.1232-1239, Vol.15, 2000. https://doi.org/10.1109/59.898095
- R Billinton, R N Allan. Reliability Evaluation of Power Systems, Plenum Press, pp. 400-405.
Cited by
- An optimal pricing scheme in electricity markets by parallelizing security constrained optimal power flow based market-clearing model vol.48, 2013, https://doi.org/10.1016/j.ijepes.2012.05.047
- Maintenance Priority Index of Overhead Transmission Lines for Reliability Centered Approach vol.9, pp.4, 2014, https://doi.org/10.5370/JEET.2014.9.4.1248
- Feature Selection and Parameters Optimization of SVM Using Particle Swarm Optimization for Fault Classification in Power Distribution Systems vol.2017, 2017, https://doi.org/10.1155/2017/4135465
- Application of an effective modified gravitational search algorithm for the coordinated scheduling problem in a two-stage supply chain vol.70, pp.1-4, 2014, https://doi.org/10.1007/s00170-013-5263-8
- A literature survey on asset management in electrical power [transmission and distribution] system vol.26, pp.10, 2016, https://doi.org/10.1002/etep.2193
- Time-horizons in the planning and operation of transmission networks: an overview vol.10, pp.4, 2016, https://doi.org/10.1049/iet-gtd.2015.0791