참고문헌
- Agarwal, A., Colak, C., Jacob, V., and Pirkul, H. (2006), Heuristics and augmented neural networks for task scheduling with non-identical machines, European Journal of Operational Research, 175(1), 296-317. https://doi.org/10.1016/j.ejor.2005.03.045
- Balin, S. (2011), Non-identical parallel machine scheduling using genetic algorithm, Expert Systems with Applications, 38, 6814-6821. https://doi.org/10.1016/j.eswa.2010.12.064
- Behnamian, J., Zandieh M., and Ghomi, F. (2009), Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm, Expert Systems with Applications, 36, 9637-9644. https://doi.org/10.1016/j.eswa.2008.10.007
- Bobrowski, P. M. and Kim, S. C. (1994), The impact of sequence dependent setup time on job shop scheduling performance, International Journal of Production Research, 32, 1503-1520. https://doi.org/10.1080/00207549408957019
- Jou, C. (2005), A genetic algorithm with sub-indexed partitioning genes and its application to production scheduling of parallel machines, Computers and Industrial Engineering, 48, 39-54. https://doi.org/10.1016/j.cie.2004.07.007
- Flynn, B. B. (1987), The effects of setup time on output capacity in cellular manufacturing, International Journal of Production Research, 25, 1761-1772.
- Frederickson, G., Hecht, M. S., and Kim, C. E. (1978), Approximation algorithm for some routing problems, SIAM Journal on Computing, 7, 178-193. https://doi.org/10.1137/0207017
- Gen, M., and Cheng, R. (2000), Genetic Algorithms and Engineering Optimization, New York : Wiley.
- Gharehgozli, A. H., Tavakkoli-Moghaddam, R., and Zaerpour, N. (2009), A fuzzy- mixed-integer goal programming mode for a parallel-machine scheduling problem with sequence-dependent setup times and release dates, Robotics and Computer-Integrated Manufacturing, 25, 853-859. https://doi.org/10.1016/j.rcim.2008.12.005
- Holland, J. H. (1975), Adaptation in natural and artificial systems, Ann Arbor, IL : University of Michigan Press.
- Hop, N. V. and Nagarur, N. N. (2004), The scheduling problem of PCBs for multiple non-identical parallel machines, European Journal of Operational Research, 158, 577-594 https://doi.org/10.1016/S0377-2217(03)00376-X
- Nait, T. D., Chu, C., Yalaoui, F., and Amodeo, L. (2003), A new approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times based on linear programming, In International conference on industrial engineering and production management (IEPM), 3, 266-274.
- Tavakkoli-Moghaddam, R., Taheri, F., Bazzazi, M., Izadi, M., and Sassani, F. (2009), Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints, Computers and Operations Research, 36, 3224-3230. https://doi.org/10.1016/j.cor.2009.02.012
- Sveltana, A., Kravchenko, S., and Werner, F. (2001), A heuristic algorithm for minimizing mean flow time with unit setups, Information Processing Letters, 79, 291-296. https://doi.org/10.1016/S0020-0190(01)00136-3
- Vallada, E. and Ruiz, R. (2011), A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times, European Journal of Operational Research, 211, 612-622. https://doi.org/10.1016/j.ejor.2011.01.011
- Yalaoui, F. and Chu, C. (2003), An efficient heuristic approach for parallel machine scheduling with job splitting and sequence-dependent setup times, IIE Transactions, 35(2), 183-190. https://doi.org/10.1080/07408170304382
피인용 문헌
- Heuristics for Non-Identical Parallel Machine Scheduling with Sequence Dependent Setup Times vol.40, pp.3, 2014, https://doi.org/10.7232/JKIIE.2014.40.3.305