A Case Study of SE and EVMS Techniques Application on Surion Helicopter R&D Program

수리온헬기 개발사업에서 시스템 엔지니어링 및 사업성과관리 기법 적용 사례연구

  • Byun, Hyung Kyun (Agency for Defense Development, Defense Acquisition Program Administration) ;
  • Lee, Sang Woo (Agency for Defense Development, Defense Acquisition Program Administration)
  • 변형균 (국방과학연구소, 방위사업청) ;
  • 이상우 (국방과학연구소, 방위사업청)
  • Published : 2012.06.30

Abstract

The System Engineering(SE) and the Earned Value Management System(EVMS), as parts of the scientific project management methodology, have been applied to Surion Helicopter R&D Program. The concept and application process of SE methodology, requirements management and applications output by DOORS program are described in this study. The concept and application process of EVMS, analysis results of schedule/cost variance for Surion RF equipment are also discussed in this study. Though the Surion R&D program is still on-going, it is found that the measures of effectiveness of SE and EVMS applications are verified.

Keywords

References

  1. 한국국방연구원, KHP사업의 효율적 추진을 위한 성과관리시스템(EVMS) 설계연구, KIDA, 2005.
  2. 방위사업청 훈령 제158호, "제95조 사업 성과관리체계의 활용 등", 2011. 8.9 개정.
  3. 방위사업청, 시스템엔지니어링 가이드(Version 1.0), pp.9-13, 2007.10.
  4. APM EVM SIG, Earned value management : APM guideline, UK., APM, pp.1-2. 2002,
  5. 국방과학연구소, 한국형다목적헬기(KMH : Korean Multi-role Helicopter) 체계요구도 분석연구, 2004.
  6. 국방과학연구소, KHP사업 효율적인 기술 관리계획서 작성을 위한 사전연구, 2005.
  7. 정호수, "국내 방위산업의 경쟁력 제고를 위한 EVMS 적용방안에 관한 연구", 공주대학교, p.16., pp.70-77. 2008.
  8. Fleming, Q. W. & Koppelman, J. M., Earned Value project Management, Project Management Institute, pp.3-12. 1996.
  9. Air Force Material Command, Guide to Analysis of Contractor Cost Data, AFMC PAM65-501, 1999.
  10. Bachman, David C., Single Point Adjustments: A New Definition with Example, Acquisition Review Quarterly, Vol(4), September 22, pp.3-12. 2001.