References
- Kim, S. (2011), Adopting Systematic Project Management Methods for Productivity Improvement : Comparison of the Project Management Maturity Levels Between SMEs and Large Firms, Asia Pacific Journal of Small Business, 33(2), 5-21.
- Kim, W. (2005), Current Status and Perspectives of Domestic EVM, The Journal of Korea Institute of Construction Engineering and Management, 6(4), 23-27.
- Yang, C., Kim, K., Shin, S., and Ryu, J. (2008), Project Progress Management by Extended Schedule Performance Index, The Journal of Architectural Institute of Korea, 24(7), 135-143.
- Choi, Y. (2002), Construction Progress Measurement System by Tracking the Work-done Performance of each Work, The Journal of Architectural Institute of Korea, 18(2), 139-150.
- Chatfield, C. and Johnson, T. (2008), Step by Step Microsoft Office Project 2007, Microsoft Press.
- Clark, F. D. and Lorenzoni, A. B. (1979), Applied cost engineering, Marcel Dekker, Inc.
- Eldin, N. N. (1989), Measurement of Work Progress : Quantitative Technique, Journal of Construction Engineering and Management, ASCE, 115(3), 462-474. https://doi.org/10.1061/(ASCE)0733-9364(1989)115:3(462)
- Fleming, Q. W. and Koppleman, J. M. (1996), Earned value project management, Project Management Institute (PMI), Upper Darby.
- Fleming, Q. W. and Koppelman, J. M. (2004), If EVM is so Good, Why Isn't it used on all Projects?, The Measurable News, PMI-College of Performance Management, 1-5.
- Jung, Y. and Kang, S. (2007), Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control, Journal of Construction Engineering and Management, 133(1), 10-21. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:1(10)
- Meredith, J. R. and S. J. Mantel (2009), Project Management : A Managerial Approach, 7th, Ed., John Wiley and Sons.
- PMI (2008), A Guide to the Project Management Body of Knowledge, 4th, Ed., Project Management Institute Inc.
- PMI (2005), Practice Standard for Earned Value Management, Project Management Institute Inc.