Development of the Estimation Software for a Petrochemical Plant

화공플랜트 견적 소프트웨어 개발에 관한 연구

  • Min, Bong-Ki (Course of Plant Engineering, Graduate School of Engineering, Hanyang University) ;
  • Lee, Jae-Heon (School of Mechanical Engineering, Hanyang University)
  • 민봉기 (한양대학교 공학대학원 플랜트엔지니어링 전공) ;
  • 이재헌 (한양대학교 기계공학부)
  • Received : 2012.01.05
  • Published : 2012.03.31

Abstract

The current dual-watchdog estimation system has individually calculated the construction, the engineering and the procurement cost. The dual-watchdog estimation system is inefficient and prolonged estimation period because of the lack of the interoperability and the difference of material unit cost and construction unit cost. In order to resolve this problem, new estimation software was developed. The estimation software is developed by making up for the weak points in existing estimation method. The cost data with the same standard is the key point. And this software enhanced accuracy and speed of the data search in stylized estimation standard. A summary of the construction, the engineering and the procurement cost was generated in this estimation software. The unit rate about the labor cost, equipment and expense through a sheet was handled. The developed estimation software has five categories on engineering cost, procurement cost, construction cost and subcontractor management sheet. In this study, the estimation software to supplement the faults of the existing estimation method was developed. And estimation software on petrochemical projects increases an efficiency of the estimation work.

Keywords