DOI QR코드

DOI QR Code

Flexural behavior model for post-tensioned concrete members with unbonded tendons

  • Kim, Kang Su (Department of Architectural Engineering, University of Seoul) ;
  • Lee, Deuck Hang (Department of Architectural Engineering, University of Seoul)
  • Received : 2011.04.11
  • Accepted : 2012.03.19
  • Published : 2012.09.25

Abstract

The need for long-span members increases gradually in recent years, which makes issues not only on ultimate strength but also on excessive deflection of horizontal members important. In building structures, the post-tension methods with unbonded tendons are often used for long-span members to solve deflection problems. Previous studies on prestressed flexural members with unbonded tendons, however, were mostly focused on the ultimate strength. For this reason, their approaches are either impossible or very difficult to be implemented for serviceability check such as deflection, tendons stress, etc. Therefore, this study proposed a flexural behavior model for post-tensioned members with unbonded tendons that can predict the initial behavior, before and after cracking, service load behavior and ultimate strength. The applicability and accuracy of the proposed model were also verified by comparing with various types of test results including internally and externally post-tensioned members, a wide range of reinforcement ratios and different loading patterns. The comparison showed that the proposed model very accurately estimated both the flexural behavior and strength for these members. Particularly, the proposed model well reflected the effect of various loading patterns, and also provided good estimation on the flexural behavior of excessively reinforced members that could often occur during reinforcing work.

Keywords

Acknowledgement

Supported by : Korea Research Foundation

References

  1. ACI Committee 318 (2005), Building code requirements for structural concrete and commentary (ACI 318M-05), American Concrete Institute, Farmington Hills, MI.
  2. ACI Committee 318 (2008), Building code requirements for structural concrete and commentary (ACI 318M-08), American Concrete Institute, Farmington Hills, MI.
  3. Allouche, E.N., Campbell, T.I., Green, M.F. and Soudki, K.A. (1999a), "Tendon stress in continuous unbonded prestressed concrete members - Part 1 parametric study", PCI J., 44(1), 86-93.
  4. Allouche, E.N., Campbell, T.I., Green, M.F. and Soudki, K.A. (1999b), "Tendon stress in continuous unbonded prestressed concrete members - Part 2: review of literature", PCI J., 44(1), 86-93.
  5. American Association of State Highway and Transportation Officials (2004), "AASHTO LRFD bridge design specifications", Third edition, AASHTO, Washington, DC.
  6. Au, F.T.K. and Du, J.S. (2004), "Prediction of ultimate stress in unbonded tendons", Mag. Concrete Res., 56(1), 1-11. https://doi.org/10.1680/macr.2004.56.1.1
  7. Au, F.T.K., Chan, K.H.E., Kwan, A.K.H. and Du, J.S. (2009), "Flexural ductility of prestressed concrete beams with unbonded tendons", Comput. Concrete, 6(6), 451-472. https://doi.org/10.12989/cac.2009.6.6.451
  8. Bondy, K.B. (1970), "Realistic reqirements for unbonded post-tensioning tendons", PCI J., 15(1), 50-59. https://doi.org/10.15554/pcij.02011970.50.59
  9. Bui, D.K. and Niwa, J. (2006), "Prediction of loading-induced stress in unbonded tendons at ultimate", Doboku Gakkai Ronbunshu E, 62(2), 428-443. https://doi.org/10.2208/jsceje.62.428
  10. BSI 8110-85 (1985), Section 4.3.7.3: Structural use of concrete, British Standards Institution, London.
  11. Campbell, T.I. and Chouinard, K.L. (1991), "Influence of non-prestressed reinforcement on the strength of unbonded partially prestressed concrete member", ACI Struct. J., 88(5), 546-551.
  12. CAN3-A23.3-M94 (1994), Design of concrete structure, Canadian Standard Association, Rexdale, Ontario.
  13. Chakrabarti, P.R. (1995), "Ultimate stress for unbonded post-tensioning tendons in partially prestressed beam", ACI Struct. J., 92(6), 689-697.
  14. Chen, W.F. (1982), Plasticity in reinforced concrete, McGraw-Hill.
  15. Collins, M.P. and Mitchell, D. (1991), Prestressed concrete structures, Prentice Hill, Englewood Cliffs, NJ.
  16. DIN 4227 (1980), Part 6: Prestressed concrete, construction of prestressed concrete member, German Code, pp. 365.
  17. Du, J.S., Au, F.T.K., Cheung, Y.K. and Kwan, A.K.H. (2008), "Ductility analysis of prestressed concrete beams with unbonded tendons", Eng. Struct., 30(1), 13-21. https://doi.org/10.1016/j.engstruct.2007.02.015
  18. Du, G. and Tao, X. (1985), "Ultimate stress of unbonded tendons in partially prestressed concrete beams", PCI J., 30(6), 72-91. https://doi.org/10.15554/pcij.11011985.72.91
  19. Harajli, M.H. (1990), "Effect of span-depth ratio on the ultimate steel stress in unbonded prestressed concrete members", ACI Struct. J., 87(3), 305-312.
  20. Harajli, M.H. (2006), "On the stress in unbonded tendon at ultimate: critical assessment and proposed change", ACI Struct. J., 103(6), 803-812.
  21. Harajli, M.H. and Kanj, M.Y. (1991), "Ultimate flexural strength of concrete members prestressed with unbonded tendons", ACI Struct. J., 88(6), 663-673.
  22. Harajli, M.H. and Kanj, M.Y. (1997), "Service load behavior of concrete members prestressed with unbonded tendons", J. Struct. Eng.-ASCE, 94(1), 2569-2589.
  23. Harajli, M.H., Khairallah, N. and Nasif, H. (1999), "Externally prestressed members: evaluation of sencond-order effect", J. Struct. Eng.-ASCE, 125(10), 1151-1161. https://doi.org/10.1061/(ASCE)0733-9445(1999)125:10(1151)
  24. Janney, J.R., Hognestad, E. and Mchenry, D. (1956), "Ultimate flexural strength of prestressed and conventionally reinforced concrete beam", ACI Struct. J., 52(2), 601-620.
  25. KCI-M-07 (2007), Design specifications for concrete structures, Korea Concrete Institute.
  26. Lee, S.H., Yeo, U.S., Shin, K.J. and Kim, W.J. (2010), "Analytical study on strengthening effect of RC beams strengthened with high-tension steel rod", 2010 Struct. Congr.-ASCE, 3590-3601.
  27. Lim, J.H., Moon, J.H. and Lee, L.H. (1999), "Experimental examination of influential variables on unbonded tendon stresses", J. Korean Concrete Inst., 11(1), 209-219.
  28. Lee, D.H. and Kim, K.S. (2011), "Flexural strength of prestressed concrete members with unbonded tendons", Struct. Eng. Mech., 38(5), 675-696. https://doi.org/10.12989/sem.2011.38.5.675
  29. Lee, L.H., Moon, J.H. and Lim, J.H. (1999), "Proposed methodology for computing of unbonded tendon stress at flexural failure", ACI Struct. J., 96(6), 1040-1048.
  30. Mattock, A.H. (1979), "Flexural strength of prestressed concrete sections by programable calculator", PCI J., 24(1), 32-54.
  31. MacGregor, R.J.G., Kreger, M.E. and Breen, J.E. (1989), "Strength and ductility of three span externally posttensioned segmental box girder bridge model", Research Report, No. 365-3F, Center for Transportation Research, The University of Texas, Austin, Texas.
  32. Mojtahedi, S. and Gamble, W.L. (1978), "Ultimate steel stresses in unbonded prestressed concrete", J. Struct. Div., 104(7), 1159-1165.
  33. Moon, J.H., Lim, J.H. and Lee, C.G. (2002), "Relation of deflection of prestressed concrete members to unbonbded tendon stress and effect of various parameters", J. Korean Concrete Inst., 14(2), 171-179. https://doi.org/10.4334/JKCI.2002.14.2.171
  34. Naaman, A.E. and Alkhairi, F.M. (1991a), "Stress at ultimate in unbonded post tensionning tendons - Part 1: evaluation of the state-of-the-art", ACI Struct. J., 88(5), 641-651.
  35. Naaman, A.E. and Alkhairi, F.M. (1991b), "Stress at ultimate in unbonded post tensionning tendons - Part 2: proposed methodology", ACI Struct. J., 88(6), 693-692.
  36. Ng, C.K. (2003), "Tendon stress and flexural strength of externally prestressed beams", ACI Struct. J., 100(5), 644-653.
  37. NEN 3880 (1984), Part H: Regulations for concrete, Dutch Code, Section 503.1.3.
  38. Ozkul, O., Nasif, H.H. and Malhas, F. (2005), Deflection prediction and cracking of beams prestressed with unbonded tendons, Serviceability of Concrete: A Symposium Honoring Dr. E.G. Nawy, SP-225, American Concrete, Institute, Farmington Hills, MI, 93-118.
  39. Ozkul, O., Nassif, H., Tanchan, P. and Harajli, M.H. (2008), "Rational approach for predicting stress in beams with unbonded tendons", ACI Struct. J., 105(3), 338-347.
  40. Roberts-Wollmann, C.L., Kreger, M.E., Rogosky, D.M. and Breen, J.E. (2005), "Stress in external tendons at ultimate", ACI Struct. J., 102(2), 206-213.
  41. Sivaleepunth, C., Niwa, J., Bui, D.K., Tamura, S. and Hamada, Y. (2006), "Prediction of tendon stress and flexural strength of externally prestressed concrete beams", Doboku Gakkai Ronbunshu E, 62(1), 260-273. https://doi.org/10.2208/jsceje.62.260
  42. Tam, A. and Pannell, F.N. (1976), "The ultimate moment resistance of unbonded partially prestressed reinforced concrete", Mag. Concrete Res., 28(97), 203-208. https://doi.org/10.1680/macr.1976.28.97.203
  43. Tan, K.H. and Tjandra, R.A. (2007), "Strengthening of RC continuous beams by external prestressing", J. Struct. Eng.-ASCE, 133(2), 195-204. https://doi.org/10.1061/(ASCE)0733-9445(2007)133:2(195)
  44. Warwaruk, J., Sozen, M.A. and Siess, C.P. (1962), Investigation of prestressed concrete for highway bridges, Part.: strength and behavior in flexure of prestressed beam, Bulletin No. 464, Engineering Experiment Station, University of Illinois, Urbana, Ill.
  45. Zhou, W. and Zheng, W.Z. (2010), "Experimental research on plastic design method and moment redistribution in continuous concrete beams prestressed with unbonded tendons", Mag. Concrete Res., 62(1), 51-64. https://doi.org/10.1680/macr.2008.62.1.51

Cited by

  1. Web-shear capacity of prestressed hollow-core slab unit with consideration on the minimum shear reinforcement requirement vol.14, pp.3, 2014, https://doi.org/10.12989/cac.2014.14.3.211
  2. P-M interaction curve for reinforced concrete columns exposed to elevated temperature vol.18, pp.4, 2016, https://doi.org/10.12989/cac.2016.18.4.479
  3. Structural performance of prestressed composite girders with corrugated steel plate webs vol.104, 2015, https://doi.org/10.1016/j.jcsr.2014.09.014
  4. Fiber method analysis of rc beam retrofitted with turnbuckle external post-tensioning vol.17, pp.1, 2016, https://doi.org/10.12989/cac.2016.17.1.067
  5. Estimation of transfer lengths in precast pretensioned concrete members based on a modified thick-walled cylinder model vol.17, pp.1, 2016, https://doi.org/10.1002/suco.201500049
  6. Dual potential capacity model for reinforced concrete beams subjected to shear vol.17, pp.3, 2016, https://doi.org/10.1002/suco.201500165
  7. Application of Hydrophilic Silanol-Based Chemical Grout for Strengthening Damaged Reinforced Concrete Flexural Members vol.7, pp.12, 2014, https://doi.org/10.3390/ma7064823
  8. Shear performance assessment of steel fiber reinforced-prestressed concrete members vol.16, pp.6, 2015, https://doi.org/10.12989/cac.2015.16.6.825
  9. Impact of shear connectors on the behaviours of box-girders with corrugated webs vol.171, pp.10, 2018, https://doi.org/10.1680/jstbu.16.00152
  10. Dual potential capacity model for reinforced concrete short and deep beams subjected to shear vol.19, pp.1, 2018, https://doi.org/10.1002/suco.201700202
  11. Nonlinear analysis method for continuous post-tensioned concrete members with unbonded tendons vol.40, pp.None, 2012, https://doi.org/10.1016/j.engstruct.2012.03.021
  12. P-M interaction curve for reinforced concrete columns exposed to elevated temperature vol.19, pp.5, 2012, https://doi.org/10.12989/cac.2017.19.5.537
  13. Behavior and stress check of concrete box girders strengthened by external prestressing vol.22, pp.2, 2018, https://doi.org/10.12989/cac.2018.22.2.133
  14. Numerical and Analytical Behavior of Beams Prestressed with Unbonded Internal or External Steel Tendons: A State-of-the-Art Review vol.44, pp.10, 2012, https://doi.org/10.1007/s13369-019-03934-3
  15. Punching Shear Strength Model for Reinforced Concrete Flat Plate Slab-Column Connection without Shear Reinforcement vol.147, pp.3, 2012, https://doi.org/10.1061/(asce)st.1943-541x.0002939