DOI QR코드

DOI QR Code

Burn-in Test Case Study for Heavy Maintenance to Improve the Reliability

중정비 신뢰성 향상을 위한 Burn-in 시험 적용 사례연구

  • Received : 2012.08.17
  • Accepted : 2012.11.20
  • Published : 2012.12.31

Abstract

The door systems in urban railway vehicles, through heavy maintenance checks by six years, 75 parts for 34 part types in 75 units have to be replaced periodically, and the remaining 68 parts for 40 part types to be replaced occasionally based on the necessity. Even though this process makes the door systems almost to be initial status, the systems have complicated mixes of components with new parts and used and then have different property from the original ones. This study suggested a burn-in test as a subsidiary tool to improve the reliability of urban railway vehicles, and suitable for testing conditions and the proposed new target value.

도시철도차량의 출입문 장치는 중정비 6년 검사에서 총 75종 단위부품 중 34종 75개의 부품을 정기적으로 교체하며, 나머지 비정기 교환부품인 40종 68개 부품도 필요 시 교체하고 있어 사실상 초기제품에 가까운 상태가 되며, 한편으로는 기존 부품과 다수의 교환된 부품이 혼용 사용되면서 완전한 신품과는 또 다른 제품특성을 가지게 된다. 본 연구는 이러한 출입문 장치의 정비 후 특징을 고려하여 도시철도차량의 신뢰성을 향상하는 방법으로 번인시험을 제안하며 시험에 적합한 조건과 목표 값을 새롭게 제시하였다.

Keywords

References

  1. IEC 60050-191, International Electrotechnical Vocabulary. Chapter 191: Dependability and quality of service.
  2. MIL-STD-721, Definition of terms for reliability and maintainability
  3. S.K. Seo (2009) MINITAB Reliability Analysis, Eretec, pp. 42.
  4. Korea Maintenance Technology Institute, Copyright(C) 2000 KMTI. All Rights Reserved.
  5. K.O. Kim (2007) Optimal System Burn-in for Maximizing Reliability of non-series System, Journal of the Korean Institute of Industrial Engineers, 33(2), pp. 273-281.
  6. Heavy Maintenance Process Guide Book of Line 1 Electric Vehicle's Door System (2012) Daegu Metropolitan Transit Corporation.
  7. Electric Vehicle Fault data Analysis of Line 1(2007-2010), Daegu Metropolitan Transit Corporation.
  8. K.J. Choi, Y.O Cho, J.D. Jung, S.A. Kim, et al. (2010) Reliability Vehicle using the Durability Analysis and Precise Diagnostic Guidelines, Korea Railroad Research Institute, pp. 119.
  9. J.W. Kim, H.S. Kim, Y.H. Yu, J.H. Jo (2011) Study on correlation between general inspection and failure of railway passenger car, Spring Conference of The Korean Society for Railway, Heongseong, PP. 1639-1641.
  10. Y. Yu, et al. (2012) Reliability Centered Rolling stock Maintenance RCRM, Spring Conference of Korean Society for Railway, Mokpo, pp. 720-725.
  11. J.C. Park, Y.D. Chun, E.S. Chung, J.J. Park (2007) Application Method of Burn-In Test to the Components for Space Launch Vehicle, Aerospace Engineering and Technology, 6(1), pp. 166-172.
  12. S.K. Seo, et al. (2010) Reliability Engineering [Revision], Kyobobook, pp. 274.
  13. S.K. Seo, et al. (2010) Reliability Engineering [Revision], Kobobook, pp. 291.
  14. M.S. Kim (2006) Understanding of HALT, USW Reliability Innovation Center, University of Suwon.
  15. S.K. Seo (2009) MINITAB Reliability Analysis, Eretec, pp. 297.
  16. Electric Vehicle Fault data Analysis of Line 1 (2012) Daegu Metropolitan Transit Corporation.