References
- Ayhan, H. and Seo, D.-W., "Laplace transform and moments of waiting times in Poisson driven (Max,+) linear systems", QUESTA, Vol. 37, No. 4, pp. 405-438, 2001.
- Ayhan, H. and Seo, D.-W., "Tail probability of transient and stationary waiting times in (Max,+) linear systems", IEEE Transaction on Automatic Control, Vol. 47, No. 1, pp. 151-157, 2002. https://doi.org/10.1109/9.981736
- Baccelli, F., Cohen, G., Olsder, G. J. and Quadrat, J-P, Synchronization and Linearity: An Algebra for Discrete Event Systems, John Wiley and Sons, 1992.
- Baccelli, F. and Schmidt, V., "Taylor series expansions for Poisson driven (Max,+) linear systems", Annals of Applied Probability, Vol. 6, No. 1, pp. 138-185, 1996. https://doi.org/10.1214/aoap/1034968069
- Baccelli, F., Hasenfuss, S. and Schmidt, V., "Transient and stationary waiting times in (max,+) linear systems with Poisson input", QUESTA, Vol. 26, pp. 301-342, 1997.
- Baccelli, F., Hasenfuss, S. and Schmidt, V., "Expansions for steady state characteristics in (Max,+) linear systems", Stochastic Models, Vol. 14, pp. 1-24, 1998. https://doi.org/10.1080/15326349808807458
- Bonvik, A. M., Dallery, Y. and Gershwin, S. B., "Approximate analysis of production system operated by a CONWIP/ finite buffer hybrid control policy", IJPR, Vol. 38, No. 13, pp. 2845-2869, 2000. https://doi.org/10.1080/00207540050117332
- Chang, T. M. and Yih, Y., "Generic Kanban systems for dynamic environments", IJPR, Vol. 32, No. 4, pp. 889-902, 1994. https://doi.org/10.1080/00207549408956977
- Cook, D. P., "Simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks", Production and Inventory Management Journal, Vol. 35, pp. 73-78, 1994.
- Duenyas, I., Hopp, W. J. and Spearman, M. L., "Characterizing the output process of a CONWIP line with deterministic processing and random outages", Management Sciences, Vol. 39, No. 8, pp. 975-988, 1993. https://doi.org/10.1287/mnsc.39.8.975
- Gilland, W., "A simulation study comparing performance of CONWIP and bottleneck-based release rules", Production Planning, Vol. 13, No. 2, pp. 211-219, 2002. https://doi.org/10.1080/09537280110069784
- Goldratt, E. M. and Cox, J., The Goal, Croton-on-Hudson, NY, North River Press, Inc., 1984.
- Goldratt, E. M. and Fox, R. E., The Race, Croton-on-Hudson, NY, North River Press, Inc., 1986.
- Gstettner, S. and Kuhn, H., "Analysis of production control systems Kanban and CONWIP", IJPR, Vol. 34, No. 11, pp. 3253-3273, 1996. https://doi.org/10.1080/00207549608905087
- Heidergott, B., Max-plus linear stochastic systems and perturbation analysis, Springer, 2006.
- Jodlbauer, H. and Huber, A., "Service level performance of MRP, Kanban, CONWIP and DBR due to parameter stability and environmental robustness", IJPR, Vol. 46, No. 8, pp. 2179-2195, 2008. https://doi.org/10.1080/00207540600609297
- Koh, S. G. and Bulfin, R. L., "Comparison of DBR with CONWIP in an Unbalanced Production Line with Three Stations", IJPR, Vol. 42, No. 2, pp. 391-404, 2004. https://doi.org/10.1080/00207540310001612026aa
- Lee, H. and Seo, D.-W., "Performance evaluation of Kanban-controlled line production systems with constant processing times", Productivity Review, Vol. 24, No. 4, pp. 183-205, 2010.
- Lee, H. and Seo, D.-W., "Comparison of CONWIP with Kanban in a production line with constant processing times", J. Korean Operations Research and Management Science Society, Vol. 36, No. 2, pp. 51-65, 2011.
- Louw, L. and Page, D. C., "Queuing network analysis approach for estimating the sizes of the time buffers in Theory of Constraints-controlled production systems", IJPR, Vol. 42, No. 6, pp. 1207-1226, 2004. https://doi.org/10.1080/2007540310001631593
- Muckstadt, J. A. and Tayur, S. R., "A comparison of alternative Kanban control mechanism: I. background and structural results", IIE Transaction, Vol. 27, pp. 140-150, 1995. https://doi.org/10.1080/07408179508936726
- Muckstadt, J. A. and Tayur, S. R., "A comparison of alternative Kanban control mechanism: II. experimental results", IIE Transaction, Vol. 27, pp. 151-161, 1995. https://doi.org/10.1080/07408179508936727
- Radovilsky, Z. D., "A quantitative approach to estimate the size of the time buffer in the theory of constraints", IJPE, Vol. 55, pp. 113-119, 1998.
- Roderick, L. M., Toland, J. and Rodriguez, F. P., "A simulation study of CONWIP versus MRP at Westinghouse", Computers and Industrial Engineering, Vol. 26, pp. 237-242, 1994. https://doi.org/10.1016/0360-8352(94)90058-2
- Schragenheim, E. and Ronen, B., "Drum-buffer-rope shop floor control", Production Inventory Management Journal, Vol. 31, No. 3, pp. 18-22, 1990.
- Spearman, M. L., Woodruff, D. L. and Hopp, W. J., "CONWIP: a pull alternative to Kanban", IJPR, Vol. 28, No. 5, pp. 879-894, 1990. https://doi.org/10.1080/00207549008942761
- Spearman, M. L. and Zazanis, M. A., "Push and pull production systems: issues and comparisons", Operations Research, Vol. 40, No. 3, pp. 521-532, 1992. https://doi.org/10.1287/opre.40.3.521
- Spencer, M. S. and Cox, J. F., "Master production scheduling development in a theory of constraints environment", Production and Inventory Management Journal, Vol. 36, No. 1, pp. 80-94, 1995.
- Ye, T. and Han, W., "Determination of buffer sizes for drum-buffer-rope controlled production system", IJPR, Vol. 46, No. 10, pp. 2827-2844, 2008. https://doi.org/10.1080/00207540600922948
Cited by
- A simulation study on S-Button factory production system vol.23, pp.4, 2014, https://doi.org/10.9709/JKSS.2014.23.4.229
- Closed-form formulae for moment, tail probability, and blocking probability of waiting time in a buffer-sharing deterministic system vol.45, pp.5, 2017, https://doi.org/10.1016/j.orl.2017.06.004
- Production Control in Multiple Bottleneck Processes using Genetic Algorithm vol.41, pp.1, 2018, https://doi.org/10.11627/jkise.2018.41.1.102