References
- Global Construction Perspectives and Oxford Economics. Global construction 2020 - a global forecast for the construction industry over the next decade to 2020. Final report 3 Mar 2011, London: 2011. 200 p.
- You T, Zi H. The economic crisis and efficiency change: evidence from the Korean construction industry. Applied Economics. 2007 Apr;39(14):1833-42. https://doi.org/10.1080/00036840600690199
- Park S, Flanagan R. Integrating whole life cost into the evaluation of design-build in Korea. In: Dainty A, editors. Proceedings of 25th Annual ARCOM Conference;2009 Sept 7-9; Nottingham. UK: Association of Researchers in Construction Management; 2009. p. 227-37.
- Wardani M, Messner J, Horman M. Comparing procurement methods for Design-Build projects. Journal of Construction Engineering and Management. 2006 Mar;132(3):230-39. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:3(230)
- Mosey D. Design and build in action, 1st ed. Oxford: Chandos Publishing; 1998. 172 p.
- Ndekugri I, Turner A. Building procurement by design and build approach. Journal of Construction Engineering and Management, 1994;120(2):243-56. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:2(243)
- Chan A, Scott D, Lam E. Framework of success criteria for Design/Build projects. Journal of Management in Engineering. 2002 July;18(3):120-28. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:3(120)
- Songer A, Molenaar K. Selecting design-build: Public and private sector owner attitudes. Journal of Management in Engineering, 1996 Nov;12(6): 47-53. https://doi.org/10.1061/(ASCE)0742-597X(1996)12:6(47)
- Ministry of Land, Transport and Maritime Affairs. Turnkey and alternatives procurement system. Technique and Safety Division. 2003. 26 p.
- Russell J, Skibniewski M, Cozier D. Qualifier-2: knowledge-based system for contractor prequalification. Journal of Construction Engineering and Management. 1990 Mar;116(1):157-71. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:1(157)
- Crowley L, Hancher D. Risk assessment of competitive procurement. Journal of Construction Engineering and Management. 1995 June;121(2):230-37. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:2(230)
- Mahdi I, Riley M, Fereig S, Alex A. A multi-criteria approach to contractor selection. Engineering Construction and Architectural Management. 2002 Feb;9(1):29-37.
- Hatush Z, Skitmore M. Criteria for contractor selection. Construction Management & Economics. 1997;15(1): 19-38. https://doi.org/10.1080/014461997373088
- Bouachera T, Kishk M, Power, L. Towards a generic framework for whole life costing in the oil industry. In: Boyd D, editors. Proceedings of 23rd Annual ARCOM Conference;2007 Sept 3-5; Belfast, UK: Association of Researchers in Construction Management; 2007. p. 863-71.
- Lee S, Lee S. A study on the introduction of best value selection. Seoul (Korea): Construction & Economy Research Institute of Korea; 2006. 126 p.
- Ahmad I. Decision-support system for modeling bid/No-bid decision problem. Journal of Construction Engineering and Management. 1990 Dec;116(4):595-608. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:4(595)
- Holt G, Olomolaiye P, Harris F. A conceptual alternative to current tendering practice. Building Research & Information. 1993;21(3):167-72. https://doi.org/10.1080/09613219308727284
- Korman T, Opfer N, Son J. Public sector design-build selection criteria. AACE International Transactions, 2002;6(PM04):1-7.
- Diekmann E. Cost-plus contractor selection: an analytical method. Engineering Costs and Production Economics. 1983 Mar;7(2):147-58. https://doi.org/10.1016/0167-188X(83)90006-X
- Hatush Z, Skitmore M. Contractor selection using multicriteria utility theory: An additive model. Building and Environment. 1998 Mar;33(2): 105-15. https://doi.org/10.1016/S0360-1323(97)00016-4
- Nguyen V. Tender evaluation by fuzzy sets. Journal of Construction Engineering and Management. 1985 Sep;111(3): 231-43. https://doi.org/10.1061/(ASCE)0733-9364(1985)111:3(231)
- Singh D, Tiong R. A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management. 2005 Jan;131(1):62-70. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(62)
- Belton V. A comparison of the analytic hierarchy process and a simple multi-attribute value function. European Journal of Operational Research. 1986 July;26(1):7-21. https://doi.org/10.1016/0377-2217(86)90155-4
- Mustafa M, Ryan T. Decision support for bid evaluation. International Journal of Project Management. 1990 Nov;8(4):230-35. https://doi.org/10.1016/0263-7863(90)90031-6
- Fong P, Choi S. Final contractor selection using the analytical hierarchy process. Construction Management and Economics. 2000 Oct;18(5):547-57. https://doi.org/10.1080/014461900407356
- Al-Harbi K. Application of the AHP in project management. International Journal of Project Management. 2001 Jan;19(1):19-27. https://doi.org/10.1016/S0263-7863(99)00038-1
- Topcu Y. A decision model proposal for construction contractor selection in Turkey. Building and Environment. 2004 Apr;39(4):469-81. https://doi.org/10.1016/j.buildenv.2003.09.009
- Waara F, Brochner J. Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management. 2006 Aug;132(8):797-804. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:8(797)
- Dyer J. Remarks on the Analytical Hierarchy Process. Management Science. 1990 Mar;36(3):249-58 https://doi.org/10.1287/mnsc.36.3.249
- Belton V, Goodwin P. Remarks on the application of the Analytic Hierarchy Process to judgmental forecasting. International Journal of Forecasting. 1996 Mar;12(1):155-61. https://doi.org/10.1016/0169-2070(95)00643-5
- Saaty T, Vargas L. The Logic of Priorities, 1st ed. Pittsburgh, PA: RWS Publications; 1991. 509 p.
- Vargas L. Reply to Remarks on the Analytic Hierarchy Process. Management Science. 1990 Mar;36(3):269-73 https://doi.org/10.1287/mnsc.36.3.269
- Ministry of Land, Transport and Maritime Affairs. Design evaluation manual for Design-build and Alternatives procurement system. Technique and Safety Division. 2007.149 p.
- Saaty, T. Decision making with the analytic hierarchy process. International Journal of Services Sciences. 2008 Mar;1(1):83-98. https://doi.org/10.1504/IJSSCI.2008.017590
- Park S. Whole life performance assessment: critical success factors. Journal of Construction Engineering and Management, 2009 Nov;135(11):1146-61. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000090
- International Standardization Organization. ISO 15686-5: Building and Constructed Assets - Service Life Planning: Part 5 - Life Cycle Costing, ISO, 1st ed. Geneva: British Standards; 2008. 42 p.
- Gann D, Salter A, Whyte J. Design quality indicator as a tool for thinking. Building Research and Information. 2003 Sep;31(5):318-33. https://doi.org/10.1080/0961321032000107564
- Office of Government Commerce. Achieving excellence in construction procurement Guide number 09: Design quality. London: OGC; 2007. 26 p.
- Yu I, Kim K. Project delivery systems and project performance: an evaluation model for public construction projects. Korea Institute of Construction Engineering and Management. 2007 Apr;07(2):41-7.