참고문헌
- Ahmadi, R., U. Bagchi, and T. A. Roemer, "Coordinated Scheduling of Customer Orders for Quick Response," Naval Research Logistics 52 (2005), 493-512. https://doi.org/10.1002/nav.20092
- Baker, K. R., "Scheduling the Production of Components at a Common Facility," IIE Transactions 20 (1988), 32-35. https://doi.org/10.1080/07408178808966147
- Blocher, J. D. and D. Chhajed, "The Customer Order Lead Time Problem on Parallel Machines," Naval Research Logistics 43 (1996), 629-654. https://doi.org/10.1002/(SICI)1520-6750(199608)43:5<629::AID-NAV3>3.0.CO;2-7
- Blocher, J. D., D. Chhajed, and M. Leung, "Customer Order Scheduling in a General Job Shop Environment," Decision Science 29 (1998), 951-981. https://doi.org/10.1111/j.1540-5915.1998.tb00883.x
- Blocher, J. D. and D. Chhajed, "Minimizing Customer Order Lead‐iime in a Two‐stage Assembly Supply Chain," Decision Science 29 (1998), 951-981. https://doi.org/10.1111/j.1540-5915.1998.tb00883.x
- Coffman, E. G., A. Nozari, and M. Yannakakis, "Optimal Scheduling of Products with Two Subassemblies on a Single Machine,"Operations Research 37 (1989), 426-436. https://doi.org/10.1287/opre.37.3.426
- Ding, F. Y., "A Pairwise Interchange Solution Procedure for a Scheduling Problem with Production of Components at a Single Facility," Computers and Industrial Engineering 18 (1990), 325-331. https://doi.org/10.1016/0360-8352(90)90054-P
- Garey, M. R., D. S. Johnson, and R. Sethi, "The Complexity of Flowshop and Jobshop Scheduling," Mathematics of Operations Research 1 (1976), 117-129. https://doi.org/10.1287/moor.1.2.117
- Gerodimos, A. E., C. A. Glass, and C. N. Potts, "Scheduling the Production of Two‐Component Jobs on a Single Machine," European Journal of Operational Research 120 (2000), 250-259. https://doi.org/10.1016/S0377-2217(99)00154-X
- Gonzalez, T. and S. Sahni, "Flowshop and job shop schedules: Complexity and approximation," Operations Research 26 (1978), 36-52. https://doi.org/10.1287/opre.26.1.36
- Graham, R. L., E. L. Lawler, J. K. Lenstra, and A. H. G. Rinnooy Kan, "Optimization and Approximation in Deterministic Machine Scheduling: A Survey," Annals of Discrete Mathematics 5 (1979), 287-326.
- Gupta, J. N. D., J. C. Ho, and A. A. van der Veen, "Single Machine Hierarchical Scheduling with Customer Orders and Multiple Job Classes," Annals of Operations Research 70 (1997), 127-143. https://doi.org/10.1023/A:1018913902852
- Hoogeveen, J. A. and T. Kawaguchi, "Minimizing total completion time in a two‐machine flowshop: analysis of special cases," Mathematics of Operations Research 24 (1999), 887-910. https://doi.org/10.1287/moor.24.4.887
- Johnson, S. M., "Optimal Two‐ and Three‐Stage Production with Setup Times Included," Naval Research Quarterly 1 (1954), 61-68. https://doi.org/10.1002/nav.3800010110
- Julien, F. M. and M. J. Magazine, "Scheduling Customer Orders: An Alternative Production Scheduling Approach," Journal of Manufacturing and Operations Management, 3 (1990), 177-199.
- Liao, C. J., "Optimal Scheduling of Products with Common and Unique Components," International Journal of Systems Science 27 (1996), 361-366. https://doi.org/10.1080/00207729608929225
- Roemer, T. A. and R. Ahmadi, "Complexity of Scheduling Customer Orders," Working Paper, Anderson School at UCLA (1997), USA.
- Yang, J., "The Complexity of Customer Order Scheduling Problems on Parallel Machines," Computers and Operations Research 32 (2005), 1921-1939. https://doi.org/10.1016/j.cor.2003.12.008
- Yang, J. and M. E. Posner, "Scheduling Parallel Machines for the Customer Order Problem," Journal of Scheduling 8 (2005), 49-74. https://doi.org/10.1007/s10951-005-5315-5