Acknowledgement
Grant : 고속도로 LCC 기초자료 축적을 위한 DB구축 연구
Supported by : 한국도로공사
LCC(Life Cycle Cost) analysis on design process has to be performed for a selection of reasonable and economical design alternatives in highway construction projects. To be performed of LCC analysis, the maintenance data such that are maintenance periods, rate of repair, maintenance cost, and so on are required. Therefore the Hi-Portal System had been developed and the maintenance data has been accumulating in the Korean Expressway Corporation. However, the data are not effectively used because the system have no consideration for LCC concept, and currently, th data are acquired by survey with experts. In the study, it is proposed that the concept of Generally Annual Maintenance are practically and easily used to perform LCC analysis. Some of generally annual maintenance data are suggested through Hi-portal data analysis due to the proposed concept and LCC analysis of a real highway construction project is preformed by comparison with a current approach. From the results, it make sure that the proposed concept are effectively used to preform LCC analysis until during exactly practical data from Hi-Portal system are obtained.
고속도로 건설사업은 기본설계, 실시설계 단계에서 합리적이고 경제적인 대안 선정을 위해 대안간의 총생애주기비용(LCC)을 산정, 비교하게 된다. LCC 산정시에는 각 대안의 보수주기, 보수율, 보수비용 등의 유지관리 정보가 필요하며, 한국도로공사의 경우에는 자체 개발하여 운영하고 있는 Hi-유지관리시스템의 정보를 이용할 수 있다. 그러나 LCC를 고려하지 않은 기존 유지관리시스템의 데이터베이스 구조 및 입력체계로 인해 유지관리 정보를 효율적으로 획득 및 적용하기가 어려워 전문가의 설문에 기초한 유지관리 정보를 주로 활용하여 LCC를 산정하여 왔다. 본 연구에서는 실제 유지관리 자료를 실용적으로 사용할 수 있도록 연간일상유지관리 개념을 제안하였다. 제안된 개념에 따라 한국도로공사의 Hi-유지관리시스템 자료를 분석하여 일부 제시하였으며 실제 고속도로 건설사업에 적용하여 본 결과, 엄밀한 LCC 분석을 위한 유지관리 데이터가 부족한 현 상황에서 효과적으로 적용할 수 있음을 확인하였다.
Grant : 고속도로 LCC 기초자료 축적을 위한 DB구축 연구
Supported by : 한국도로공사