References
- Z. Li, X. Zhao, R. Dollevoet and M. Molodova (2008) Differential wear and plastic deformation as causes of squat at track local stiffness change combined with other track short defects, Vehicle System Dynamics, Vol.46, No.1, pp.237-246. https://doi.org/10.1080/00423110801935855
- UIC code 712 (2002) Rail defects, 4th ed., International Union of Railways (UIC).
- Evaluation Criteria for Inspection Results of Track Inspection Car (2008) Dept of Track Maintenance, Korail (in Korean).
- S.C. Yang (2009) Enhancement of the finite-element method for the analysis of vertical train-track interactions, Proc. IMechE Part F: J. Rail and Rapid Transit, Vol.223, pp.609-620. https://doi.org/10.1243/09544097JRRT285
- S.C. Yang, C.K. Hong (2007) A method for the analysis of train/slab track interaction on settled roadbed, Journal of the Korean Society for Railway, 10(3), pp. 296-305 (in Korean).
- W. Zhai, Z. Cai (1997) Dynamic interaction between a lumped mass vehicle and a discretely supported continuous rail track, Computer & Structures, 63(5), 987-997. https://doi.org/10.1016/S0045-7949(96)00401-4
- X. Lei, N.A. Noda (2002) Analyses of dynamic response of vehicle and track coupling system with random irregularity of track vertical profile, J. of sound and vibration, 258(1), 147-165. https://doi.org/10.1006/jsvi.2002.5107
- Y.Q. Sun, M. Dhanasekar (2002) A dynamic model for the vertical interaction of the rail track and wagon system, Int. J. of Solids and Structures, 39(5), 1337-1359. https://doi.org/10.1016/S0020-7683(01)00224-4
- M.C. Kim (2003) Development of a quasi-three dimensional train/track/bridge interaction analysis pro-gram for evaluating dynamic characteristics of high speed railway bridges, Journal of Computational Structural Engineering Institute of Korea, 16(2), pp. 141-151 (in Korean).
- S.B. Seo (2002) Railway Track Engineering, revised edition, Eul & Al, Seoul (in Korean).
- R.G. Dong, R.V. Dukkipati (1994) A finite element model of railway track and its application to the wheel flat problem, Proc. IMechE Part F: J. Rail and Rapid Transit, Vo. 208, pp. 61-72. https://doi.org/10.1243/PIME_PROC_1994_208_234_02
- C. Esveld (2001) Modern Railway Track, 2nd ed., MRT Productions.
- Design Standards for Railway Structures and Commentary - Track Structure "Ballasted Track" - Draft (1997) Railway Technology Research Institute, Ministry of Transport of Japan (in Japanese).
- S.C. Yang (2009) A study on relevant replacement period of rail faster for high-speed railway, Research Report, Korea Railway Research Institute, Korea Rail Network Authority (in Korean).
- C. Onorii, (2009) Mechanical behavior of traditional and antivibration railway tracks with recycled rubber materials, Doctoral thesis, Universita Degli Studi Di Napoli Federico II.
- E.G. Berggren, M.X.D. Li, J. Spannar (2008) A new approach to the analysis and penetration of vertical track geometry quality and rail roughness, Wear, Vol. 265, pp. 1488-1496. https://doi.org/10.1016/j.wear.2008.01.029
- ISO 3095 (2001) Railway applications - Acoustics - Measurement of noise emitted by railbound vehicles, International Organization of Standards (ISO).
- S.C. Yang, Y.S. Kang, M.C. Kim (2000) Evaluation method of vibration-reduction efficiency of slab track, Journal of Korea Society of Civil Engineers, Vol. 20, No.4-D, 427-435 (in Korean).
- S.C. Yang, S.Y. Jang, E. Kim (2011) Determination of Upperlimit of rail pad stiffness for ballasted and concrete track of high-speed railway considering running safety, Journal of the Korean Society for Railway, 14(6), pp. 526-534 (in Korean). https://doi.org/10.7782/JKSR.2011.14.6.526
Cited by
- Non-contact Local Fault Detection of Railroad Track using MFL Technology vol.14, pp.5, 2014, https://doi.org/10.9798/KOSHAM.2014.14.5.275
- A Study of Detecting Broken Rail using the Real-time Monitoring System vol.28, pp.4, 2013, https://doi.org/10.14346/JKOSOS.2013.28.4.001
- The Fatigue Life Evaluation of CWR based on the Rail Grinding vol.35, pp.5, 2015, https://doi.org/10.12652/Ksce.2015.35.5.1191
- Rail Corrugation Effects on the Dynamic Behavior of Clips of Rail Fastening System in Operation Environment of Urban Railway vol.19, pp.4, 2016, https://doi.org/10.7782/JKSR.2016.19.4.489
- Development of a Numerical Method of Vertical Train/Track Interaction in the Track Section with Hanging Sleepers vol.15, pp.3, 2012, https://doi.org/10.7782/JKSR.2012.15.3.251