References
- Belvaux, G. and Wolsey, L. A. (2000), A specialized branch-and-cut system for lot-sizing problems, Management Science, 46(5), 724-738. https://doi.org/10.1287/mnsc.46.5.724.12048
- Belvaux, G. and Wolsey, L. A. (2001), Modeling practical lot-sizing problems as mixed- integer programs, Management Science, 47(7), 993-1007. https://doi.org/10.1287/mnsc.47.7.993.9800
- Clark, A. R. and Clark, S. J. (2000), Rolling-horizon lotsizing when set-up times are sequence-dependent, International Journal of Production Research, 38(10), 2287-2307. https://doi.org/10.1080/00207540050028106
- Drexl, A. and Haase, K. (1995), Proportional lotsizing and scheduling, International Journal of Production Economics, 40(1), 73-87. https://doi.org/10.1016/0925-5273(95)00040-U
- Drexl, A. and Haase, K. (1996), Sequential-analysis based randomized-regret-methods for lot-sizing and scheduling, Journal of the Operational Research Society, 47(2), 251- 265. https://doi.org/10.1057/jors.1996.23
- Gopalakrishnan, M. (2000), A modified framework for modeling set-up carryover in the capacitated lotsizing problem, International Journal of Production Research, 38(14), 3421-3424. https://doi.org/10.1080/002075400418324
- Gupta, D. and Magnusson, T. (2005), The capacitated lot-sizing and scheduling problem with sequencedependent setup costs and setup times, Computers & Operations Research, 32(4), 727-747. https://doi.org/10.1016/j.cor.2003.08.014
- Fleischmann, B. and Meyr, H. (1997), The general lotsizing and scheduling problem, OR Spektrum, 19, 11-21. https://doi.org/10.1007/BF01539800
- Meyr, H. (2000), Simultaneous lotsizing and scheduling by combining local search with dual reoptimization, European Journal of Operational Research, 120(2), 311-326. https://doi.org/10.1016/S0377-2217(99)00159-9
- Han, J., Lee, Y., Kim, S., and Park, E. (2007), An alternative modeling for lot-sizing and scheduling problem with a decomposition based heuristic algorithm, Journal of the Korean Institute of Industrial Engineers, 33, 373-380.
- Meyr, H. (2002), Simultaneous lotsizing and scheduling on parallel machines, European Journal of Operational Research, 139(2), 277-292. https://doi.org/10.1016/S0377-2217(01)00373-3
- Porkka, P., Vepsalainen, A. P., and Kuula, M. (2003), Multiperiod production planning carrying over setup time, International Journal of Production Research, 41(6), 1133-1148. https://doi.org/10.1080/0020754021000042995
- Sox, C. R. and Gao, Y. (1999), The capacitated lot sizing problem with setup carry-over, IIE Transactions, 31(2), 173-181.
- Suerie, C. and Stadtler, H. (2003), The capacitated lotsizing problem with linked lot sizes, Management Science, 49(8), 1039-1054. https://doi.org/10.1287/mnsc.49.8.1039.16406
- Suerie, C. (2006), Modeling of period overlapping setup times, European Journal of Operational Research, 174(2), 874-886. https://doi.org/10.1016/j.ejor.2005.03.033