Abstract

A Renewable Portfolio Standard(RPS) is a regulation that requires the increased generation of energy from renewable energy sources such as solar, wind, fuel cell, small hydro, biomass and geothermal. By environmental, technical and these regulatory reasons, the amount of renewable energy sources will be increased in a network. However, it is hard to assess risk of a transmission network with large scale renewable energy sources because the output characteristics of renewable energies are intermittent. This paper evaluates effects of a transmission system with supplemental large scale renewable energies into the existing system. To evaluate these effects, a methodology for risk level of components in a network is proposed considering steady state and contingency N-1 in this paper. We consider line current and bus voltage in each state of a network.

Keywords

References

  1. R. Billinton and R. Allan “Reliability Evaluation of Power Systems”, Pitman Books, England, 1984.
  2. V. Sermanson, N. Maruejouls, S. Lee ‘”Probabilistic Reliability Assessment of the North American Eastern Interconnection Transmission Grid”, CIGRE conference, Paris, September (2002).
  3. Ruiz, P.A.; Sauer, P.W.; “Voltage and Reactive Power Estimation for Contingency Analysis Using Sensitivities” Power Systems, IEEE Transactions on Volume 22, Issue 2, May 2007 Page(s):639 - 647. https://doi.org/10.1109/TPWRS.2007.894868
  4. Lingling Fan; Osborn, D.; Miland, J.; Zhixin Miao; “Regional transmission planning for large-scale wind power” Power & Energy Society General Meeting, 2009. PES '09. IEEE 26-30 July 2009 Page(s):1 - 6.
  5. Pei Zhang; Graham, M.; Ramsay, D.; “Prioritization of Transmission Projects using EPRI Probabilistic Risk Assessment Program” Power and Energy Engineering Conference, 2009. APPEEC 2009. Asia-Pacific 27-31 March 2009 Page(s):1 - 5.
  6. Musirin, I.; Rahman, T.K.A.; “Voltage stability based weak area clustering technique in power system” Power and Energy Conference, 2004. PECon 2004. Proceedings. National 29-30 Nov. 2004 Page(s):235 - 240.
  7. Sakakibara, E.; Matsushita, K.; Iwamoto, S.; “A study on transmission planning prioritization using multi-objective evaluation” Power & Energy Society General Meeting, 2009. PES '09. IEEE 26-30 July 2009 Page(s):1 - 6.
  8. B. Wollenberg and A. Wood, “Power Generation, Operation and Control”, 2nd ed. New York: Wiley, 1996.
  9. B. Stott and O. Alsac, “Fast decoupled load flow,” IEEE Trans. Power App. Syst., vol. PAS-93, pp. 859–869, May/Jun. 1974.
  10. “전력계통 신뢰도 및 전기품질 유지기준”, 지식경제부 고시 제2009-280호, Dec. 2009.
  11. Arthur Mazer, “Electric power planning for regulated and deregulated markets”, John Wiley & Sons, 2007.
  12. Lingling Fan; Zhixin Miao; Osborn, D., “Wind Farms With HVDC Delivery in Load Frequency Control”, IEEE Transactions on Power Systems, vol. 24, Issue 4, pp. 1894-1895, 2009. https://doi.org/10.1109/TPWRS.2009.2030256

Cited by

  1. Transmission Network Expansion Planning Using Risk Level Improvement Index vol.63, pp.6, 2014, https://doi.org/10.5370/KIEE.2014.63.6.752