DOI QR코드

DOI QR Code

Flexural strength of prestressed concrete members with unbonded tendons

  • Lee, Deuck Hang (Department of Architectural Engineering, University of Seoul) ;
  • Kim, Kang Su (Department of Architectural Engineering, University of Seoul)
  • Received : 2010.07.14
  • Accepted : 2011.04.06
  • Published : 2011.06.10

Abstract

It is difficult to accurately predict the flexural strength of prestressed members with unbonded tendons, unlike that of prestressed members with bonded tendons, due to the unbonded behavior between concrete and tendon. While there have been many studies on this subject, the flexural strength of prestressed members with unbonded tendons is still not well understood, and different standards in various countries often result in different estimation results for identical members. Therefore, this paper aimed to observe existing approaches and to propose an improved model for the ultimate strength of prestressed members with unbonded tendons. Additionally, a large number of tests results on flexural strength of prestressed members with unbonded tendons were collected from previous studies, which entered into a database to verify the accuracy of the proposed model. The proposed model, compared to existing approaches, well estimated the flexural strength of prestressed members with unbonded tendons, adequately reflecting the effects of influencing factors such as the reinforced steel ratio, the loading patterns, and the concrete strength. The proposed model also provided a reasonably good estimation of the ultimate strength of over-reinforced members and high-strength concrete members.

Keywords

Acknowledgement

Supported by : Korea Research Foundation

References

  1. ACI Committee 318 (1995), "Building code requirements for structural concrete and commentary (ACI 318M-95)", American Concrete Institute, Farmington Hills, MI.
  2. ACI Committee 318 (2005), "Building code requirements for structural concrete and commentary (ACI 318M-05)", American Concrete Institute, Farmington Hills, MI.
  3. ACI Committee 318 (2008), "Building code requirements for structural concrete and commentary (ACI 318M-08)", American Concrete Institute, Farmington Hills, MI.
  4. Allouche, E.N., Campbell, T.I., Green, M.F. and Soudki, K.A. (1999), "Tendon stress in continuous unbonded prestressed concrete members - Part 1 parametric study", PCI J., 44(1), 86-93.
  5. Au, F.T.K. and Du, J.S. (2004), "Prediction of ultimate stress in unbonded tendons", Mag. Concrete Res., 56(1), 1-11. https://doi.org/10.1680/macr.2004.56.1.1
  6. Au, F.T.K., Chan, K.H.E., Kwan, A.K.H. and Du, J.S. (2009), "Flexural ductility of prestressed concrete beams with unbonded tendons", Comput. Concrete, 6(6), 451-472. https://doi.org/10.12989/cac.2009.6.6.451
  7. American Association of State Highway and Transportation Officials (2004), "AASHTO LRFD bridge design specifications", Third Edition, AASHTO, Washington, DC.
  8. Bondy, K.B. (1970), "Realistic reqirements for unbonded post-tensioning tendons", PCI J., 15(1), 50-59. https://doi.org/10.15554/pcij.02011970.50.59
  9. Bui, D.K. and Niwa, J. (2006), "Prediction of loading-induced stress in unbonded tendons at ultimate", Doboku Gakkai Ronbunshu E, 62(2), 428-443. https://doi.org/10.2208/jsceje.62.428
  10. BSI 8110-85 (1985), "Section 4.3.7.3: structural use of concrete", British Standards Institution, London.
  11. Campbell, T.I. and Chouinard, K.L. (1991), "Influence of non-prestressed reinforcement on the strength of unbonded partially prestressed concrete member", ACI Struct. J., 88(5), 546-551.
  12. CAN3-A23.3-M94 (1994), "Design of concrete structure", Canadian Standard Association, Rexdale, Ontario.
  13. Chakrabarti, P.R. (1995), "Ultimate stress for unbonded post-tensioning tendons in partially prestressed beam", ACI Struct. J., 92(6), 689-697.
  14. Collins, M.P. and Mitchell, D. (1991), Prestressed Concrete Structures, Prentice Hill, Englewood Cliffs, NJ.
  15. DIN 4227 (1980), "Part 6: Prestressed concrete, construction of prestressed concrete member", German Code.
  16. Du, J.S., Au, F.T.K., Cheung, Y.K. and Kwan, A.K.H. (2008), "Ductility analysis of prestressed concrete beams with unbonded tendons", Eng. Struct., 30(1), 13-21. https://doi.org/10.1016/j.engstruct.2007.02.015
  17. Du, G. and Tao, X. (1985), "Ultimate stress of unbonded tendons in partially prestressed concrete beams", PCI J., 30(6), 72-91. https://doi.org/10.15554/pcij.11011985.72.91
  18. Harajli, M.H. (1990), "Effect of span-depth ratio on the ultimate steel stress in unbonded prestressed concrete members", ACI Struct. J., 87(3), 305-312.
  19. Harajli, M.H. (2006), "On the stress in unbonded tendon at ultimate: critical assessment and proposed change", ACI Struct. J., 103(6), 803-812.
  20. Harajli, M.H. and Kanj, M.Y. (1991), "Ultimate flexural strength of concrete members prestressed with unbonded tendons", ACI Struct. J., 88(6), 663-673.
  21. Janney, J.R., Hognestad, E. and Mchenry, D. (1956), "Ultimate flexural strength of prestressed and conventionally reinforced concrete beam", ACI Struct. J., 52(2), 601-620.
  22. KCI-M-07 (2007), Design Specifications for Concrete Structures, Korea Concrete Institute.
  23. Lee, L.H., Moon, J.H. and Lim, J.H. (1999), "Proposed methodology for computing of unbonded tendon stress at flexural failure", ACI Struct. J., 96(6), 1040-1048.
  24. Mojtahedi, S. and Gamble, W.L. (1978), "Ultimate steel stresses in unbonded prestressed concrete", J. Struct. Div.-ASCE, 104(7), 1159-1165.
  25. Moon, J.H., Lim, J.H. and Lee, C.G. (2002), "Relation of deflection of prestressed concrete members to unbonded tendon stress and effect of various parameters", J. Korea Concrete Inst., 14(2), 171-179. https://doi.org/10.4334/JKCI.2002.14.2.171
  26. Macgregor, R.J.G., Kregor, M.E. and Breen, J.E. (1989), "Strength and ductility of three span externally posttensioned segmental box girder bridge model", Research Report, No. 365-3F, Center for Transportation Research, The University of Texas, Austin, Texas.
  27. Naaman, A.E. and Alkhairi, F.M. (1991a), "Stress at ultimate in unbonded post tensionning tendons - Part 1: evaluation of the state-of-the-art", ACI Struct. J., 88(5), 641-651.
  28. Naaman, A.E. and Alkhairi, F.M. (1991b), "Stress at ultimate in unbonded post tensionning tendons - Part 2: proposed methodology", ACI Struct. J., 88(6), 693-692.
  29. Ng, C.K. (2003), "Tendon stress and flexural strength of externally prestressed beams", ACI Struct. J., 100(5), 644-653.
  30. NEN 3880 (1984), Part H: Regulations for Concrete, Dutch Code, Section 503.1.3.
  31. Ozkul, O., Nasif, H.H. and Malhas, F. (2005), "Deflection prediction and cracking of beams prestressed with unbonded tendons", Serviceability of Concrete: A Symposium Honoring Dr. E. G. Nawy, SP-225, American Concrete, Institute, Farmington Hills, MI.
  32. Ozkul, O., Nassif, H., Tanchan, P. and Harajli, M.H. (2008), "Rational approach for predicting stress in beams with unbonded tendons", ACI Struct. J., 105(3), 338-347.
  33. Robert-Wollmann, C.L., Kregor, M.E., Rogosky, D.M. and Breen, J.E. (2005), "Stress in external tendons at ultimate", ACI Struct. J., 102(2), 206213.
  34. Sivaleepunth, C., Niwa, J., Bui, D.K., Tamura, S. and Hamada, Y. (2006), "Prediction of tendon stress and flexural strength of externally prestressed concrete beams", Doboku Gakkai Ronbunshu E, 62(1), 260-273. https://doi.org/10.2208/jsceje.62.260
  35. Tam, A. and Pannell, F.N. (1976), "The ultimate moment resistance of unbonded partially prestressed reinforced concrete", Mag. Concrete Res. 28(97), 203-208. https://doi.org/10.1680/macr.1976.28.97.203
  36. Tan, K.H. and Tjandra, R.A. (2007), "Strengthening of RC continuous beams by external prestressing", J. Struct. Eng.-ASCE, 133(2), 195-204. https://doi.org/10.1061/(ASCE)0733-9445(2007)133:2(195)
  37. Warwaruk, J., Sozen, M.A. and Siess, C.P. (1962), "Investigation of prestressed concrete for highway bridges, part.: strength and behavior in flexure of prestressed beam", Bulletin No. 464, Engineering Experiment Station, University of Illinois, Urbana, Ill.
  38. Zhou, W. and Zheng, W.Z. (2010), "Experimental research on plastic design method and moment redistribution in continuous concrete beams prestressed with unbounded tendons", Mag. Concrete Res., 62(1), 51-64. https://doi.org/10.1680/macr.2008.62.1.51

Cited by

  1. Estimation of transfer lengths in precast pretensioned concrete members based on a modified thick-walled cylinder model vol.17, pp.1, 2016, https://doi.org/10.1002/suco.201500049
  2. Nonlinear and time-dependent analysis of continuous unbonded prestressed concrete beams vol.119, 2013, https://doi.org/10.1016/j.compstruc.2012.12.014
  3. Discussion of “Flexural strength of large-scale ultra high performance concrete prestressed T-beams” 1Appears in the Canadian Journal of Civil Engineering, 38(11): 1185–1195 [doi: 10.1139/l11-078]. vol.39, pp.6, 2012, https://doi.org/10.1139/l2012-040
  4. Conceptual design of prestressed slab bridges through one-way flexural load balancing vol.48, pp.5, 2013, https://doi.org/10.12989/sem.2013.48.5.615
  5. P-M interaction curve for reinforced concrete columns exposed to elevated temperature vol.18, pp.4, 2016, https://doi.org/10.12989/cac.2016.18.4.479
  6. Nonlinear analysis method for continuous post-tensioned concrete members with unbonded tendons vol.40, 2012, https://doi.org/10.1016/j.engstruct.2012.03.021
  7. Flexural behavior model for post-tensioned concrete members with unbonded tendons vol.10, pp.3, 2012, https://doi.org/10.12989/cac.2012.10.3.241
  8. Analysis of elastic foundation plates with internal and perimetric stiffening beams on elastic foundations by using Finite Differences Method vol.45, pp.2, 2013, https://doi.org/10.12989/sem.2013.45.2.169
  9. Fiber method analysis of rc beam retrofitted with turnbuckle external post-tensioning vol.17, pp.1, 2016, https://doi.org/10.12989/cac.2016.17.1.067
  10. Web-shear capacity of prestressed hollow-core slab unit with consideration on the minimum shear reinforcement requirement vol.14, pp.3, 2014, https://doi.org/10.12989/cac.2014.14.3.211
  11. Shear performance assessment of steel fiber reinforced-prestressed concrete members vol.16, pp.6, 2015, https://doi.org/10.12989/cac.2015.16.6.825
  12. Ultimate Stress of Large-Diameter Strands in Simple Unbonded Post-Tensioned Beams vol.115, pp.5, 2018, https://doi.org/10.14359/51702249
  13. Control of Tensile Stress in Prestressed Concrete Members Under Service Loads vol.12, pp.1, 2018, https://doi.org/10.1186/s40069-018-0266-3
  14. P-M interaction curve for reinforced concrete columns exposed to elevated temperature vol.19, pp.5, 2011, https://doi.org/10.12989/cac.2017.19.5.537
  15. Improved prediction of long-term prestress loss in unbonded prestressed concrete members vol.174, pp.None, 2011, https://doi.org/10.1016/j.engstruct.2018.07.038
  16. Numerical and Analytical Behavior of Beams Prestressed with Unbonded Internal or External Steel Tendons: A State-of-the-Art Review vol.44, pp.10, 2011, https://doi.org/10.1007/s13369-019-03934-3
  17. Punching Shear Strength Model for Reinforced Concrete Flat Plate Slab-Column Connection without Shear Reinforcement vol.147, pp.3, 2011, https://doi.org/10.1061/(asce)st.1943-541x.0002939
  18. Feasibility and flexural behavior of RC beams prestressed with straight unbonded aluminum alloy tendons vol.24, pp.7, 2011, https://doi.org/10.1177/1369433220981662