References
- Bachman, A., Janiak, A., and Kovalyov, M. Y. (2002), Minimizing the total weighted completion time of deteriorating jobs, Information Processing Letters, 81(2), 81-84. https://doi.org/10.1016/S0020-0190(01)00196-X
- Browne, S. and Yechiali, U. (1990), Scheduling deteriorating jobs on a single processor, Operations Research, 38, 495-498. https://doi.org/10.1287/opre.38.3.495
- Cheng, T. C. E. and Ding, Q. (2000), Single machine scheduling with deadlines and increasing rates of processing times, Acta Informatica, 36, 673-692. https://doi.org/10.1007/s002360050170
- Gen, M. and Cheng, R. (1997), Genetic Algorithms and Engineering Design, Wiley, New York.
- Goldberg, D. E. (1989), Genetic Algorithms in Search, Optimization and Machine Learning. Addison-Wes ley, New York.
- Graves, G. H. and Lee, C. Y. (1999), Scheduling maintenance and semiresumable jobs on a single machine, Naval Research Logistics, 46, 845-863. https://doi.org/10.1002/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#
- Gupta, J. N. D. and Gupta, S. K. (1988), Single facility scheduling with nonlinear processing times, Computers and Industrial Engineering, 14, 387-393. https://doi.org/10.1016/0360-8352(88)90041-1
- Kovalyov, Y. M. and Kubiak, W. (1998), A fully polynomial approximation scheme for minimizing makespan of deteriorating jobs, Journal of Heuristics, 3, 287-297. https://doi.org/10.1023/A:1009626427432
- Kubiak, W. and Velde, S. (1998), Scheduling deteriorating jobs to minimize makespan, Naval Research Logistics, 45, 511-523. https://doi.org/10.1002/(SICI)1520-6750(199808)45:5<511::AID-NAV5>3.0.CO;2-6
- Kunnathur, A. S. and Gupta, S. K. (1990), Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem, European Journal of Operational Research, 47, 56-64. https://doi.org/10.1016/0377-2217(90)90089-T
- Lee, C. Y. and Chen, Z. L. (2000), Scheduling of jobs and maintenance activities on parallel machines, Naval Research Logistics, 47, 61-67.
- Lee, C. Y. and Leon, V. J. (2001), Machine scheduling with a rate-modifying activity, European Journal of Operational Research, 128, 119-128. https://doi.org/10.1016/S0377-2217(99)00066-1
- Lee, C. Y. and Lin, C. S. (2001), Single-machine scheduling with maintenance and repair rate-modifying activities, European Journal of Operational Research, 135, 493-513. https://doi.org/10.1016/S0377-2217(00)00322-2
- Mosheiov, G. (1991), V-Shaped polices to scheduling deteriorating jobs, Operation Research, 39, 979-991. https://doi.org/10.1287/opre.39.6.979
- Qi, X., Chen, T., and Tu, F. (1999), Scheduling the maintenance on a single machine, Journal of the Operational Research Society, 50, 1071-1078. https://doi.org/10.1057/palgrave.jors.2600791
- Sortrakul, N., Nachtmann, C. R., and Cassady, C. R. (2005), Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine, Computers In Industry, 56, 161-168. https://doi.org/10.1016/j.compind.2004.06.005
- Wang, J. L., Sun, L., and Sun, L. (2011), Single-machine total completion time scheduling with a timedependent deterioration, Applied Mathematical Modelling, 35, 1506-1511. https://doi.org/10.1016/j.apm.2010.09.028
- Wang, C. S. and Uzsoy, R. (2002), A genetic algorithm to minimize maximum lateness on a batch processing machine, Computers and Operations Research, 29, 1621-1640. https://doi.org/10.1016/S0305-0548(01)00031-4
Cited by
- A Study on Single Machine Scheduling with a Rate-Modifying Activity and Time-Dependent Deterioration After the Activity vol.30, pp.1, 2013, https://doi.org/10.7737/KMSR.2013.30.1.015
- An Improved Genetic Algorithm for Single-Machine Inverse Scheduling Problem vol.2014, pp.1563-5147, 2014, https://doi.org/10.1155/2014/370560
- Machine scheduling of time-dependent deteriorating jobs with determining the optimal number of rate modifying activities and the position of the activities vol.9, pp.1, 2015, https://doi.org/10.1299/jamdsm.2015jamdsm0007
- 단일 복구조정활동 하에 단계적 퇴화를 가지는 단일기계 생산일정계획 vol.37, pp.3, 2014, https://doi.org/10.11627/jkise.2014.37.3.43
- Optimisation of the reverse scheduling problem by a modified genetic algorithm vol.53, pp.23, 2011, https://doi.org/10.1080/00207543.2014.988890